View Single Post
Old 16th October 2006, 06:44   #1
KJBrissy
Stop Traverston Dam!!!!
 
KJBrissy's Avatar
 
Join Date: Oct 2006
Location: CBD, Brisbane, Australia
Posts: 1,647
Thanks: 77
Thanked 56 Times in 47 Posts
Rep Power: 4 KJBrissy is on a distinguished road
Points: 6,668, Level: 53 Points: 6,668, Level: 53 Points: 6,668, Level: 53
Level up: 54% Level up: 54% Level up: 54%
Activity: 1% Activity: 1% Activity: 1%
Default Complete» Green Square Fortitude Valley: (14F/59m/Mixed Use)


Quote:
Project Rundown

Status| Complete

Location| Fortitude Valley, Brisbane

Developer| Leighton

Height| 13F/50m

Price tag| Unknown

Completion Date| 2008

Project Site| Click here


It's good to see all of these 4.5 and 5 star green rated proposals. Lets hope they stay that way to the end.

Quote:
Originally Posted by SoulvisionQ1 View Post


Site> Here
Mixed use - Urban Village, Located in the Valley.

Green Square, developed by Leighton Properties, is the largest mixed use Corporate Office Park developed in Brisbane over the last 15 years. Green Square has been designed to accommodate over 49,000m2 of A-Grade Commercial office space, High Tech Utility facilities, community facilities and a residential precinct. These buildings will surround a Pocket Park and retail plaza providing food outlets and services for staff and visitors.

The site is located within 250 metres of all public transport and a public car park. The continuation of Alfred Street provides vehicle access to the site and easy pedestrian access to Brunswick Street Railway Station and the Valley Metro Retail Centre. Access will be further enhanced by the completion of North South Bypass Tunnel.

Location:

Master Plan:






Last edited by SoulVision; 2nd September 2008 at 14:37.
KJBrissy is offline   Reply With Quote