Hale St will wind up looking the same. It turns out that the same roadway edging is now being applied to the Hale St flyover. (3-4 panels are up already on the river side face). I think future generations are going to be able to date this road construction phase within 1-2 years by the design elements across town.
On the riverside walkway you can get a really good look at the assembly process, construction logistics etc of the piling operations, revetting for the bank, pile pouring and the self-supporting bridge section moulds across the river.