Go Back   SkyScraperLife > Local Skyscraper Forums - Latin America > Foro Latinoamericano > Construcciones y Proyectos-LA
Connect with Facebook
Register FAQ Members List Calendar Mark Forums Read

Reply
 
LinkBack Thread Tools Display Modes
Old 4th November 2009, 03:19   #186
Senior Member
 
Join Date: Aug 2009
Posts: 645
Thanks: 0
Thanked 41 Times in 33 Posts
Rep Power: 0 EL PERUCHO is an unknown quantity at this point
Points: 2,596, Level: 30 Points: 2,596, Level: 30 Points: 2,596, Level: 30
Level up: 31% Level up: 31% Level up: 31%
Activity: 38% Activity: 38% Activity: 38%
Default

Quote:
Originally Posted by trade-of View Post
mi lado peruano no evita ayudarles a postear avances del westin

QUE BRAVAZO SE ESTA PONIENDO EL WESTIN
EL PERUCHO is online now   Reply With Quote
SkyScraperLife
Old 5th November 2009, 03:08   #187
Solitary hunter
 
capoerista16@'s Avatar
 
Join Date: Sep 2007
Location: Lima-perú
Posts: 3,025
Thanks: 319
Thanked 533 Times in 367 Posts
Rep Power: 8 capoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond repute
Points: 13,675, Level: 76 Points: 13,675, Level: 76 Points: 13,675, Level: 76
Level up: 77% Level up: 77% Level up: 77%
Activity: 16% Activity: 16% Activity: 16%
Default

Quote:
Originally Posted by zerocool View Post
La última novedad es que se va a construir otro complejo mixto en el paño ubicado en el cruce de El Derby y Manuel Olguin. Incluye tres torres de oficinas, un hotel cinco estrellas y un centro comercial top.
El render ya circulaba hace buen tiempo pero como propuesta, ya se confirmó su construcción; ahora, lo que no queda claro es cual de estos dos complejos se edificará en ese paño. Corren las apuestas.

Será este?












O este?








O quizas ambos? (un poco dificil pero no imposible porque el paño de terreno es amplio).

Lo que si se sabe es que será edificado por Inmobiliari, los mismos que acaban de entregar la Torre Capital.
que interesante se ven ambos...el primero esta chvr por el diseño u npoco mas atrevido....y el otro tambien me gusta mucho...lamentablemente creo que se trata de dos propuestas..(sinceramente espero equivocarme y que se construyan los dos)..lo bueno es que esta confirmado cualquiera de ambas torres le vendria bien a surco..

pd: chvr las fotos del wesitn trade of
__________________
Artista Marcial
capoerista16@ is offline   Reply With Quote
Old 5th November 2009, 03:11   #188
Solitary hunter
 
capoerista16@'s Avatar
 
Join Date: Sep 2007
Location: Lima-perú
Posts: 3,025
Thanks: 319
Thanked 533 Times in 367 Posts
Rep Power: 8 capoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond reputecapoerista16@ has a reputation beyond repute
Points: 13,675, Level: 76 Points: 13,675, Level: 76 Points: 13,675, Level: 76
Level up: 77% Level up: 77% Level up: 77%
Activity: 16% Activity: 16% Activity: 16%
Default

Túnel de dos kilómetros cruzará por debajo del río Rímac


La obra permitirá descongestionar la Vía de Evitamiento. La inversión será de 600 millones de dólares
Un túnel de dos kilómetros pasará por debajo del río Rímac. Esta será la importante obra que a partir del próximo año se empezará a construir y que demandará una inversión de 600 millones de dólares, señaló el alcalde de Lima Luis Castañeda Lossio.

La obra, también conocida como “Línea Amarilla”, permitirá descongestionar el tráfico de la Vía de Evitamiento, convertido en caótico para los conductores.

La “Línea Amarilla” forma parte de una obra total de nueve kilómetros que se iniciará en el puente Huáscar en El Agustino y llegará hasta la avenida Universitaria, según informó la agencia Andina.

LOS TRABAJOS
La obra total tendrá una duración de cinco años divididos en dos partes. En total se construirán 16 kilómetros de carriles que se conectarán con el Corredor Segregado de Alta capacidad (Cosac) entre las avenidas Habich y Javier Prado.
El proyecto incluye la construcción de 30 puentes, 8 viaductos, dos intercambios viales y tres pasos a desnivel.

La obra será realizada por la empresa brasileña Constructora OAS SRL, que construyó la “Línea Amarilla” de Río de Janeiro.

Los trabajos serán financiados por el cobro del peaje.
Fuente

me encanta la noticia..
__________________
Artista Marcial
capoerista16@ is offline   Reply With Quote
The Following 4 Users Say Thank You to capoerista16@ For This Useful Post:
-Edu-  (8th November 2009), Chanchamayo  (6th November 2009), uomo_111  (6th November 2009), zerocool  (5th November 2009)
Old 5th November 2009, 15:01   #189
Senior Member
 
izcandar's Avatar
 
Join Date: Sep 2009
Location: del puente a la alameda
Posts: 569
Thanks: 182
Thanked 153 Times in 111 Posts
Rep Power: 0 izcandar is an unknown quantity at this point
Points: 2,105, Level: 27 Points: 2,105, Level: 27 Points: 2,105, Level: 27
Level up: 28% Level up: 28% Level up: 28%
Activity: 32% Activity: 32% Activity: 32%
Default

Quote:
Originally Posted by zerocool View Post





Al parecer esa es una super pantalla LED!,sin duda este diseño debe quedar
izcandar is offline   Reply With Quote
Old 7th November 2009, 15:19   #190
Asi o mas abertzale?
 
zerocool's Avatar
 
Join Date: Apr 2009
Location: San Borja, Lima
Posts: 658
Thanks: 134
Thanked 396 Times in 198 Posts
Rep Power: 0 zerocool is an unknown quantity at this point
Points: 4,040, Level: 40 Points: 4,040, Level: 40 Points: 4,040, Level: 40
Level up: 41% Level up: 41% Level up: 41%
Activity: 27% Activity: 27% Activity: 27%
Default En construcción

Club Nautico Poseidon


Con una inversión estimada en 60 millones de dólares se viene construyendo en el kilómetro 57.5 de la Carretera Panamericana Sur, en Pucusana, el Club Naútico Poseidón, uno de los proyectos arquitectónicos más ambiciosos de los últimos tiempos en el país, el cual estará listo en el verano del 2011.

El proyecto incluye un condominio cerrado y exclusivo, con muelle náutico, sistema levadizo para yates y patio de yates, un club house con piscinas de agua dulce, áreas deportivas y de juegos para niños y un helipuerto.

A la fecha el proyecto se encuentra en su primera fase y a fines del 2011 estará terminada la habilitación urbana y las áreas comunes como el Club House, El Muelle Náutico, la zona de deportes, con lo cual sus actuales más de 100 primeros propietarios ya podrán disfrutar el verano 2011 de sus comodidades.

El Club Náutico Poseidón es una urbanización privada que reúne todos los privilegios de un balneario naútico y está desarrollado sobre una exclusiva caleta con playa privada y un excelente muelle deportivo-náutico, entre Lima y Asia. Se han lotizado 198 unidades habitacionales y 18 Villas privadas, todos con vista al mar, sobre una gran área de 400,000 m2.

Cada uno de los lotes con áreas mayores a los 400 metros cuadrados se cotiza en aproximadamente 100 mil dólares, un precio muy competitivo para el segmento socioeconómico premium que busca tranquilidad, comodidad, seguridad y privacidad a la hora de adquirir una “segunda casa”.

“El proyecto está dirigido a quienes buscan una vivienda secundaria, de fin de semana, que brinde una alternativa de desahogo a la vida en ciudad, que permita un amplio contacto con la naturaleza, propiciando el descanso y el relax en un clima saludable con aire puro y bello paisaje, así como la posibilidad de practicar deportes, tanto náuticos como de tierra, en un ambiente de exclusividad y seguridad, y que además en un futuro muy cercano podría ser una vivienda los 365 días del año por la facilidad de estar a solo minutos de la ciudad", manifestó Marina Tejada, Director de Poseidón.

__________________
La hora Inca kola
zerocool is offline   Reply With Quote
The Following User Says Thank You to zerocool For This Useful Post:
Chanchamayo  (7th November 2009)
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 02:26.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0

SkyScraperLife.Com
2006 - 2009
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255