Old 27th September 2008, 03:23   #16
Build the Freedom Tower!
 
Daquan13's Avatar
 
Join Date: Aug 2007
Posts: 441
Thanks: 4
Thanked 9 Times in 9 Posts
Rep Power: 3 Daquan13 is on a distinguished road
Points: 1,867, Level: 25 Points: 1,867, Level: 25 Points: 1,867, Level: 25
Level up: 26% Level up: 26% Level up: 26%
Activity: 0% Activity: 0% Activity: 0%
Default

Quote:
Originally Posted by Jehosaphat View Post
Is it still not too late to consider rebuilding the original twin towers?


I'm afraid that it is.

A lot of money has already been invested in the current project, and to rebuild the Twins now, probably would require an addtional ten years or more and much more money.

Besides, the 09-11 families, some of them anyway, don't want it and it was agreed that they WOULDN'T be rebuilt.

And people wouldn't work in them again.

Last edited by Daquan13; 27th September 2008 at 03:26..
Daquan13 is offline   Reply With Quote
SkyScraperLife
Old 28th September 2008, 01:37   #17
Senior Member
 
Join Date: Sep 2008
Posts: 192
Thanks: 1
Thanked 4 Times in 3 Posts
Rep Power: 0 Jehosaphat is an unknown quantity at this point
Points: 547, Level: 10 Points: 547, Level: 10 Points: 547, Level: 10
Level up: 11% Level up: 11% Level up: 11%
Activity: 0% Activity: 0% Activity: 0%
Default

maybe the twins could be ressurected elsewhere. Say, in Boston, or in the Wasatch range.
Jehosaphat is offline   Reply With Quote
Old 28th September 2008, 04:27   #18
Build the Freedom Tower!
 
Daquan13's Avatar
 
Join Date: Aug 2007
Posts: 441
Thanks: 4
Thanked 9 Times in 9 Posts
Rep Power: 3 Daquan13 is on a distinguished road
Points: 1,867, Level: 25 Points: 1,867, Level: 25 Points: 1,867, Level: 25
Level up: 26% Level up: 26% Level up: 26%
Activity: 0% Activity: 0% Activity: 0%
Default

Fat chance!
Daquan13 is offline   Reply With Quote
Old 28th September 2008, 14:13   #19
Senior Member
 
Join Date: Sep 2008
Posts: 192
Thanks: 1
Thanked 4 Times in 3 Posts
Rep Power: 0 Jehosaphat is an unknown quantity at this point
Points: 547, Level: 10 Points: 547, Level: 10 Points: 547, Level: 10
Level up: 11% Level up: 11% Level up: 11%
Activity: 0% Activity: 0% Activity: 0%
Default

What about rebuilding them up the Hudson...in Poughkeepsie, for instance, or in Albany?
Jehosaphat is offline   Reply With Quote
Old 28th September 2008, 21:38   #20
Refugee
 
TalB's Avatar
 
Join Date: May 2008
Location: Pleasantville, NY
Posts: 1,125
Thanks: 0
Thanked 36 Times in 30 Posts
Rep Power: 3 TalB is on a distinguished road
Points: 2,646, Level: 31 Points: 2,646, Level: 31 Points: 2,646, Level: 31
Level up: 32% Level up: 32% Level up: 32%
Activity: 0% Activity: 0% Activity: 0%
Default

Firm gets World Trade Center gold
Firm gets World Trade Center gold

BY DOUGLAS FEIDEN and GREG B. SMITH
DAILY NEWS STAFF WRITERS

Sunday, September 28th 2008, 12:39 AM

The Port Authority plans to pay an engineering firm and its partners $374 million for design work on the World Trade Center Transportation Hub and five other Ground Zero projects, documents obtained by the Daily News show.

The bonanza for STV and partners comes with the projects years from completion, final design elements and price tags uncertain and nothing visible to passers-by but a vast pit west of Church St.

It also comes with questions about conflicts of interest. During the time STV was winning contracts from the Port Authority of New York & New Jersey, it was negotiating to buy an affiliate of a firm run by Anthony Sartor, the PA board member overseeing World Trade Center redevelopment.

Because of this, the commissioner in charge of rebuilding the 16-acre site was forced to repeatedly recuse himself from numerous votes regarding the mega project.

In August, STV wound up not buying Sartor's company. Nevertheless, during the time his firm was negotiating with STV Sartor attended an unusual meeting between the PA and STV to discuss the transportation hub - a project the PA predicts will net STV and partners a stunning $302 million.

That works out to $503 per square foot for a 600,000-square-foot transportation hub. In comparison, the architect hired to complete the 2.8 million-square-foot Time Warner Center at Columbus Circle got about $22.50 per square foot, sources said.

Besides the transportation hub, STV and partners were hired by the Port Authority to design an underground vehicle security center, WTC streets and infrastructure, and aspects of the performing arts center, the Freedom Tower and the September 11 Memorial.

The most expensive contract went to a joint venture, Downtown Design Partnership, to design the hub. DDP consists of STV, another engineering firm, DMJM Harris, and architect Santiago Calatrava.

The hub will connect multiple transit lines, including PATH trains and NYC Transit Authority subways, and features an extravagant winged entranceway. Its total costs have soared from $2.5 billion to $3.5 billion and may go higher.

In January, STV began negotiating to purchase a smaller engineering firm, Paulus, Sokolowski & Sartor, an affiliate of National Grid Energy Services. Sartor is CEO of Paulus and president of National Grid, although in a statement to The News he claims he hasn't had an equity stake in Paulus since 2000.

Sartor says he notified the Port Authority of STV's intentions to buy Paulus and began recusing himself from PA votes regarding STV's contracts.

In July, however, Sartor showed up at a meeting in the Park Ave. townhouse of the hub's architect, Calatrava, along with representatives of STV and other members of the Port Authority, according to a participant at the meeting.

The participant said the architect Calatrava did most of the talking and that he didn't recall Sartor speaking at the gathering.

"Commissioner Sartor acted prudently in this matter to eliminate both the appearance and any potential for a conflict of interest," said Sartor's spokesman, Timothy White.

Weeks after some aspects of STV's plans to buy Sartor's affiliate were disclosed in the New York Observer, the transaction was terminated.

Most of the payments to STV and partners were listed in Port Authority documents obtained by The News dated June that included "forecast at completion" costs. The estimates top all figures previously disclosed.

On Friday Port Authority officials insisted the estimates were not final, noting a specific list of costs and completion dates will be released this week.

"The forecast at completion numbers are pure speculation. We're in the middle of an assessment for the entire World Trade Center site, which we'll have out next week," said spokesman Steve Coleman.

The concentration of multiple contracts with one firm and its partners comes as the costs of all the multilayered Trade Center projects have ballooned and construction has fallen years behind schedule.

dfeiden@nydailynews.com
__________________
I have respected your views, so I expect you to do the same for me.
TalB is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 14:00.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0

SkyScraperLife.Com
2006 - 2009
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255