thanks imre always good updates
the thread title may have to change to 818m or even 819m if they place beaon platform on top.
ill soon add latest diagram.
cheers![]()
thanks imre always good updates the thread title may have ]
thanks imre always good updates
the thread title may have to change to 818m or even 819m if they place beaon platform on top.
ill soon add latest diagram.
cheers![]()

Hi all.
The crane disassembly proceedure plan is (was) as follows. The revision so far is that the crane at level 99 is the Favco M220D that was on top on the North side that was taken down in Aug '07 and put up on level 99 in Nov '07 instead of an Ogawa.
The first slide is just to show the 3 tower cranes.
TC #1 at the bottom is the last of the 3 that is up there now.
![]()
thanks fury. great update
another part of burj dubais history coming up.

Hi all.
burjdubaiskyscraper - Tony Montana
09 05 20
09 05 25
I am quite surprised to see how much landscaping is still left to be done. I figured podium zone A (the side facing the lake - with the crane above) would still have lots to do being it is the staging area for the top crane. These pics show all 3 sides have alot left to be done. Great shots though, showing there is some landscaping features coming along.
![]()
Bookmarks