![]() |
|
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| | #1 | |||||||||||
| Member ![]() Join Date: Feb 2008 Location: Thane
Posts: 43
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]()
| Two factors are maintaining Germany's position as the leader in wind power generation projects. One is the 2006 law that required German grid companies to connect to new windfarms as soon as they start operating and to carry the cost of the necessary connections. This development is said to have reduced costs for windfarm developers by 25 percent to 30 percent and has motivated new projects | |||||||||||
| | |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
| |