![]() |
|
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| | #1 | |||||||||||
| Member ![]() Join Date: Feb 2008 Location: Thane
Posts: 43
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]()
| Germany has scrapped plans to build an ultra high-speed rail link between the city of Munich and its airport. Transport Minister Wolfgang Tiefensee said the Transrapid line would be too expensive at well over three billion euros compared to 1.85 billion euros original estimate. | |||||||||||
| | |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
| |