![]() |
|
| | | ||||||
| | LinkBack | Thread Tools | Display Modes |
| | #6 | |||||||||||
| ( ( MoReNeNsE ) ) ![]() Join Date: Jan 2007 Location: Paso del rey, Argentina
Posts: 11,862
Thanks: 524
Thanked 1,486 Times in 980 Posts
Rep Power: 16 ![]() ![]() ![]() ![]() ![]() ![]()
| ![]() Es que de verdad va a ser asi.. E Norte fijate en la nota que puse mas arriba.. y la J??
__________________ | |||||||||||
| | |
| SkyScraperLife | ||
| |
| | #7 | |||||||||||
| [Simpleplanner] ![]() Join Date: Nov 2007 Location: Quilmes, Buenos Aires, Argentina
Posts: 356
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2 ![]() ![]()
| me gusta el recorrido de la I no sabia q tambien estaba la J...
__________________ It's not the end | |||||||||||
| | |
| | #8 | |||||||||||
| Banned ![]() Join Date: Sep 2007 Location: Buenos Aires
Posts: 1,200
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]() ![]()
| Bue para ahora la duda q me quedo mariano es, q se va a llamar Linea E Norte, osea nueva linea a eso t referis.....???????????????? Last edited by elnabu_de_blv; 30th March 2008 at 23:32.. | |||||||||||
| | |
| | #9 | |||||||||||
| cool ![]() Join Date: Jun 2007
Posts: 1,421
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 4 ![]() ![]() ![]()
| che no habia visto el mapa de la linea I, es enorme el recorrido. si se van a tardar lo mismo en construirla que la linea H la van a terminar de aca a 10 años
__________________ My DrEAm Is t0 Fly... 0ver tHe RainboU... SOO HIGH....rise up | |||||||||||
| | |
| | #10 | |||||||||||
| Banned ![]() Join Date: Sep 2007 Location: Buenos Aires
Posts: 1,200
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]() ![]()
| ![]() Jajaj...no creo....dicen q se van a traer CAPAS....las TBM, sabes en un año ya esta la linea terminada..... | |||||||||||
| | |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
| |