Go Back   SkyScraperLife > Local Skyscraper Forums - Latin America > Venezuela > Infraestructura y Proyectos
Register FAQ Members List Calendar Mark Forums Read

Reply
 
LinkBack (1) Thread Tools Display Modes
Old 21st February 2008, 19:51   #21
Premium Member
 
Killman 2.0's Avatar
 
Join Date: Dec 2006
Posts: 220
Thanks: 1
Thanked 0 Times in 0 Posts
Rep Power: 2 Killman 2.0 is on a distinguished road
Points: 1,327, Level: 20 Points: 1,327, Level: 20 Points: 1,327, Level: 20
Level up: 21% Level up: 21% Level up: 21%
Activity: 0% Activity: 0% Activity: 0%
Default

Iniciaron colocación de la estructura metálica de la estación Libertador del Metro de Maracaibo


Texto: Yesenia Rincón Castellano
Panorama Digital 21/02/2008
Maracaibo

Instalaron las dos primeras pilas de 20 que lleva esa
edificación. Con ello se empieza a armar un rompecabezas de 999 piezas metálicas que sostendrán el techado. El costo de todas esas estructuras es del 25% del valor de todo el edificio que vale Bs. 7 millardos.


Sin cerrar el paso de vehículos por la avenida Sabaneta (frente a Las Playitas)ayer a las 3:00 de la tarde se colocaron las dos primeras pilas de 2.100 kilogramos, para así comenzar a armar un rompecabezas de 999 piezas metálicas que sostendrán la cubierta de la estación Libertador del Metro de Maracaibo.

Francisco Urbina, presidente de la empresa de transporte masivo explicó que la colocación de las piezas se hizo con una grúa de gran capacidad, que se instaló en la acera norte de la estación, donde están los antiguos terrenos de las tiendas Ali Joyas y Época, que fueron expropiadas para realizar todas esas labores.

“La instalación de esas 999 piezas es una experiencia importante en las obras de ingeniería de esta ciudad, pues se van a subir a una altura de 12 metros, un total de 150 mil kilogramos de metal. El costo de todo eso es el equivalente al 25% del valor de toda la estación que cuesta 7 millardos de bolívares”, precisó Urbina.

Ledy Tapia, gerente de construcción de obras civiles del Metro de Maracaibo explicó que la estación Libertador es diferente a las del resto que están a lo largo del corredor vial Sabaneta y forman parte de la Línea 1, pues se trata de la estación más grande y más alta (con tres pisos) y la cubierta no será en forma convexa, sino cóncava sobre pilas inclinadas.

“Las columnas de 41 centímetros de diámetro y 12,70 metros de alto, pesan 2.100 kilos cada una, por lo que la instalación se hace con una grúa con capacidad de 140 toneladas y una altura de 190 pies. Las que fueron instaladas hoy (ayer) son las primeras de 20, que van amarradas por 10 vigas, y 30 correas”, expuso el ingeniero Raimundo Vaquero, gerente de proyectos de Precowayss, empresa encargada de construir la obra civil del Metro.

“Toda esa estructura es construida por el taller de preaceros Pellysary, que es la misma organización que se ha encargado de construir los techos de los centros comerciales Sambil y buena parte de los estadios deportivos de toda Venezuela”, agregó Ledy Tapia.

El movimiento de la grúa para éstos trabajos, se hizo sin necesidad de cerrar la vía a las rutas de transporte que pasan por la zona y sin ningún contratiempo.

Los transeúntes y compradores de esa zona comercial miraban con curiosidad los grandes pilares.

“La semana pasada veía los trabajos lentos pero desde ahora veo que ya casi va a quedar lista esa estación”, dijo emocionado Roberto Romero, de 61 años, un poblador del sector Arismendi que pasaba por Sabaneta.

Sobre esos avances el presidente del Metro aseguró que la colocación de las piezas metálicas en la estación Libertador estará lista en tres meses y en ese mismo tiempo debería estar lista la cubierta. Luego se continuará con el techado de la estación Urdaneta.
__________________
Überhari

Que agradable conseguirme con caras conocidas por estos lares
Killman 2.0 is offline   Reply With Quote
Old 22nd February 2008, 04:09   #22
Moderador Latino
 
Ray_alessandro's Avatar
 
Join Date: Nov 2006
Location: Maracaibo, Venezuela
Posts: 3,820
Thanks: 3
Thanked 16 Times in 12 Posts
Rep Power: 6 Ray_alessandro has a brilliant futureRay_alessandro has a brilliant futureRay_alessandro has a brilliant futureRay_alessandro has a brilliant futureRay_alessandro has a brilliant future
Points: 5,771, Level: 49 Points: 5,771, Level: 49 Points: 5,771, Level: 49
Level up: 50% Level up: 50% Level up: 50%
Activity: 1% Activity: 1% Activity: 1%
Default

Excelente

Por aca coloco las imagenes de como "quedaria" la Est. Libertador



y un video de lo que seria la Est. Padilla:



Ray_alessandro is offline   Reply With Quote
Old 28th February 2008, 20:06   #23
Moderador Latino
 
Ray_alessandro's Avatar
 
Join Date: Nov 2006
Location: Maracaibo, Venezuela
Posts: 3,820
Thanks: 3
Thanked 16 Times in 12 Posts
Rep Power: 6 Ray_alessandro has a brilliant futureRay_alessandro has a brilliant futureRay_alessandro has a brilliant futureRay_alessandro has a brilliant futureRay_alessandro has a brilliant future
Points: 5,771, Level: 49 Points: 5,771, Level: 49 Points: 5,771, Level: 49
Level up: 50% Level up: 50% Level up: 50%
Activity: 1% Activity: 1% Activity: 1%
Default

ESTACIÓN PADILLA







So Sexy
Ray_alessandro is offline   Reply With Quote
Old 29th February 2008, 05:24   #24
Premium Member
 
Killman 2.0's Avatar
 
Join Date: Dec 2006
Posts: 220
Thanks: 1
Thanked 0 Times in 0 Posts
Rep Power: 2 Killman 2.0 is on a distinguished road
Points: 1,327, Level: 20 Points: 1,327, Level: 20 Points: 1,327, Level: 20
Level up: 21% Level up: 21% Level up: 21%
Activity: 0% Activity: 0% Activity: 0%
Default

Muy sexy!
__________________
Überhari

Que agradable conseguirme con caras conocidas por estos lares
Killman 2.0 is offline   Reply With Quote
Old 6th March 2008, 02:37   #25
Premium Member
 
Killman 2.0's Avatar
 
Join Date: Dec 2006
Posts: 220
Thanks: 1
Thanked 0 Times in 0 Posts
Rep Power: 2 Killman 2.0 is on a distinguished road
Points: 1,327, Level: 20 Points: 1,327, Level: 20 Points: 1,327, Level: 20
Level up: 21% Level up: 21% Level up: 21%
Activity: 0% Activity: 0% Activity: 0%
Default

Adiestran a personal en la atención a discapacitados



Texto: Yesenia Rincón
El Metro de Maracaibo celebró las segundas jornadas de atención y abordaje para las personas con discapacidad visual, auditiva y limitaciones neuro- motoras.

En objetivo del taller fue formar al nuevo personal que labora en la empresa de transporte masivo en la atención de los usuarios, para que éstos puedan sentirse completamente satisfechos al hacer uso del sistema en las tres estaciones que están en funcionamiento: Altos de La Vanega, El Varillal y El Guayabal.

En la sede del centro de atención comunitario del Metro, los integrantes del Equipo de Integración Zulia —adscrito al Ministerio del Poder Popular para la Educación— tuvieron a su cargo la tarea de impartir el taller a los trabajadores pertenecientes a las oficinas administrativas, operadores de las estaciones y fiscales operativos.

La coordinadora de este equipo, Omaira Colmenarez, explicó que el propósito del taller es impartir un plan de formación a través de estrategias de atención para el personal de Metro de Maracaibo y lograr así la sensibilización hacia los usuarios discapacitados de la región.

La capacitación se desarrolló bajo el lema “Ser diferente es algo común”.
__________________
Überhari

Que agradable conseguirme con caras conocidas por estos lares
Killman 2.0 is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

LinkBacks (?)
LinkBack to this Thread: http://www.skyscraperlife.com/infraestructura-y-proyectos/9161-metro-de-maracaibo.html
Posted By For Type Date
el metro de maracaibo (vision del futuro cuando pase por las playitas) - ELBROLLO.COM This thread Refback 14th May 2008 09:30


All times are GMT. The time now is 13:31.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213