Go Back   SkyScraperLife > Local Skyscraper Forums - Europe > Spain > Infraestructuras
Register FAQ Members List Calendar Mark Forums Read

Reply
 
LinkBack Thread Tools Display Modes
Old 22nd October 2006, 23:41   #1
Premium Member
 
Tintoretto's Avatar
 
Join Date: Oct 2006
Location: Madrid
Posts: 560
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2 Tintoretto is on a distinguished road
Points: 3,493, Level: 36 Points: 3,493, Level: 36 Points: 3,493, Level: 36
Level up: 37% Level up: 37% Level up: 37%
Activity: 0% Activity: 0% Activity: 0%
Default Madrid:El Ayuntamiento hará una red de carriles bici de 370 km.

http://www.madridiario.es/mdo/actual...ici-221006.php








Unirá la Casa de Campo con Barajas o la Venta de la Rubia con Fuencarral

Los ciclistas contarán con una red básica de 370 kilómetros que se vertebrará de periferia a centro


Madrid, 20/10/2006. Elena Delgado
Habrá que esperar aún ocho años para ver concluida la red ciclista de Madrid, que tendrá una malla de 370 kilómetros de vías. El Plan Director contempla la construcción de 230 nuevas vías que atravesarían Madrid de norte a sur y de este a oeste pasando por el centro. El paseo de la Castellana, Alcalá, Atocha, Bailén, Príncipe de Vergara o Menéndez Pelayo, entre otras muchas, serán las futuras rutas de los pedaleadores.
Pinchar sobre el plano para verlo ampliado

El proyecto de convertir a Madrid en una ciudad más europea, menos contaminada y con una movilidad más llevadera sigue adelante con el Plan Director Ciclista. Sus responsables ya han diseñado una "teórica" red de vías ciclistas que se extendería de norte a sur y de este a oeste de la capital, con una básica de 370 kilómetros que incluiría las vías existentes y en ejecución más otros 230 kilómetros proyectados. Así lo refleja el mapa de "vías teóricas" del Plan Director que está redactando el Ayuntamiento cuyo propósito es vertebrarlas como una malla parecida a la red de Metro. Cuando finalicen las obras y si se respeta la teoría, los que se sumen a circular en bici por Madrid podrán ir de un extremo a otro de Madrid e incluso, en muchos casos, enlazar con las carriles que ya existen en la Comunidad.

El Plan contempla carriles bici por calles como Alcalá, Arenal (o aledañas), Bailén, Atocha, Ronda de Atocha, Ronda de Toledo, Príncipe de Vergara, Menéndez Pelayo, la Castellana hasta Fuencarral El-Pardo, Concha Espina, Bravo Murillo, Alberto Aguilera, paseo de las Delicias o avenida de Oporto serán sólo algunas de las muchas sobre las que se configurará la red la cual se plantea "como una infraestrucutra de la ciudad, dirigida a facilitar los recorridos en bici entre los principales generadores de viajes pero a la vez facilitar la combinación con el transporte colectivo para paliar los condicionantes de la orografía así como las distancias", asegura Javier Maestro, Jefe del Departamento de Proyectos de la Dirección General de Infraestructuras . En definitiva un soporte de movilidad que unirá la Casa de Campo y Barajas o la Venta de la Rubia con Fuencarral-El Pardo.

Según el Plan cada distrito debería contar con un acceso a la red básica, "lo que se traduce en una trama no mayor de 2,5 kilómetros". Además, la citada red deberá incluir los nuevos desarrollos urbanísticos. Los responsables del proyecto ven en él la oportunidad de convertir a la bicicleta en una alternativa a los desplazamientos individuales en coche "de los que más de 400.000 tienen a diario menos de cinco kilómetros de recorido". Asimismo el Plan se podría ver impulsado por la nueva candidatura de Madrid para los Juegos Olímpicos de 2016 por lo que tomaría forma en un horizonte próximo pues no exige grandes inversiones ni grandes obras.
Tintoretto is offline   Reply With Quote
Old 27th November 2006, 19:42   #2
Spanish moderator
 
metromurcia's Avatar
 
Join Date: Oct 2006
Location: Murcia, España
Posts: 1,637
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 metromurcia is a jewel in the rough
Points: 3,225, Level: 35 Points: 3,225, Level: 35 Points: 3,225, Level: 35
Level up: 36% Level up: 36% Level up: 36%
Activity: 0% Activity: 0% Activity: 0%
Default

DIOS SANTO!! Es una red enorme de carriles bici. Ya podrian nuestros gobernantes murcianos tomar ejemplo de Madrid
__________________
ALHAMBRA de GRANADA - La octava maravilla del Mundo
metromurcia is offline   Reply With Quote
Old 28th November 2006, 15:11   #3
Inflamable member
 
vichase's Avatar
 
Join Date: Oct 2006
Location: Sant Joan, (Alacant)
Posts: 469
Thanks: 0
Thanked 2 Times in 2 Posts
Rep Power: 2 vichase is on a distinguished road
Points: 2,227, Level: 28 Points: 2,227, Level: 28 Points: 2,227, Level: 28
Level up: 29% Level up: 29% Level up: 29%
Activity: 0% Activity: 0% Activity: 0%
Default

Menudas piernas se les pondran a los madrileños...
__________________
TRAM Metropolitano de Alicante·
L1 L2 L3 L4 L5 L6 L7 L8 L9
Cercanias C-1; C-3

Videos del TRAM
vichase is offline   Reply With Quote
Old 12th January 2007, 00:00   #4
Premium Member
 
Tintoretto's Avatar
 
Join Date: Oct 2006
Location: Madrid
Posts: 560
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2 Tintoretto is on a distinguished road
Points: 3,493, Level: 36 Points: 3,493, Level: 36 Points: 3,493, Level: 36
Level up: 37% Level up: 37% Level up: 37%
Activity: 0% Activity: 0% Activity: 0%
Default

http://www.madridiario.es/2007/Enero...al/6523/d.html


Sumados a los que ya existen o están en proyecto alcanzarán los 457 kilómetros

Madrid construirá hasta 2016 una red básica de carriles-bici de 274 kilómetros




El Ayuntamiento ha presentado oficialmente su proyecto para dotar a la ciudad de una trama de vías que permita normalizar el uso de la bicicleta. La Red Básica, de 274 kilómetros, se vertebrará por el centro, conectará los 21 distritos y todos los nuevos desarrollos urbanos, además del Anillo Verde Ciclista. Con las vías ya existentes o en proyecto en 2016 Madrid tendrá 457 kilómetros para pedaleadores.
Tintoretto is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 07:24.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203