Go Back   SkyScraperLife > Local Skyscraper Forums - Europe > Spain > Infraestructuras
Register FAQ Members List Calendar Mark Forums Read

Reply
 
LinkBack (2) Thread Tools Display Modes
Old 13th June 2007, 06:30   #51
mago blanco
 
azordorado's Avatar
 
Join Date: Apr 2007
Posts: 8,798
Thanks: 2
Thanked 37 Times in 32 Posts
Rep Power: 15 azordorado has a reputation beyond reputeazordorado has a reputation beyond reputeazordorado has a reputation beyond reputeazordorado has a reputation beyond reputeazordorado has a reputation beyond reputeazordorado has a reputation beyond reputeazordorado has a reputation beyond reputeazordorado has a reputation beyond reputeazordorado has a reputation beyond repute
Points: 16,910, Level: 83 Points: 16,910, Level: 83 Points: 16,910, Level: 83
Level up: 84% Level up: 84% Level up: 84%
Activity: 100% Activity: 100% Activity: 100%
Default

una nota relacionada

SENER ha realizado, a lo largo de los últimos 15 años, un elevado número de trabajos para Metro Madrid. Entre ellos, destacar los proyectos para la ampliación de la Línea 4 (tramo Esperanza - Hortaleza, 1994-96), la Línea Mar de Cristal - Barajas (Recintos Feriales, 1997), así como, más recientemente, los estudios de ampliación hacia el Eje Paseo de la Castellana de Línea 1 (tramo Plaza de Castilla - Chanmartín, 1998-99), y de la Línea 2 (2003).

Asimismo, SENER ha participado en diferentes proyectos y estudios de movilidad, adecuación de instalaciones, infraestructuras eléctricas y de comunicación, y otras específicas del ámbito de la ingeniería.


En este ámbito, SENER ha realizado los proyectos de estaciones emblemáticas de Madrid, como lo es el Intercambiador de Nuevos Ministerios, o la Estación de Cercanías R.E.N.F.E. de Sol - Gran Vía, que permitirá el enlace con las Líneas 1, 2 y 5 de Metro. Además, se han realizado estudios complementarios, como el de una Estación - Intercambiador en Chamartín, para 4 líneas de metro.

SENER ha participado, asimismo, en la construcción de algunas de las infraestructuras proyectadas para Metro de Madrid, como es el caso de la Línea 10 (1999-2000), en la que ha llevado a cabo la Asistencia Técnica a la Dirección de Obra.




http://images.google.com.mx/imgres?i...%3Des%26sa%3DN
__________________
+++++Asturias+++++
azordorado is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

LinkBacks (?)
LinkBack to this Thread: http://www.skyscraperlife.com/infraestructuras/3411-madrid-ampliacion-de-la-red-de-metro.html
Posted By For Type Date
XIII Tema oficial ampliación de Metro y Tranvias 03-07 - SkyscraperCity This thread Refback 3rd August 2008 19:22
Sevilla21.com - Ver tema - Decoración estaciones de Metro This thread Refback 3rd March 2008 01:02


All times are GMT. The time now is 14:05.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213