Post Metro and Tram projects in Iran

I posted these in separate threads in SSC, but since it didnt generate much (or any) interest, I'll just post them all together here.

The seven largest cities of Iran each with a population of atleast 1 million, houses 15 million Iranians. Plans exist to provide each of them with metro or light rail networks of three or four lines, ranging from 40 km up to 110 km

In addition to Tehran, they are Mashhad, Esfahan, Shiraz, Karaj, Tabriz and Ahvaz. Construction of at least one line has started in each of the cities except Ahvaz.


Ahvaz

Metro - PLANNED



Quote:

The phase zero studies of Ahwaz Urban Railway Project carried out by Andishkar Consulting Engineers in 2002 calls for the construction of four lines, with a total length of approximately 70 km. Traffic modeling results indicate that line 1 will carry the most passengers (14000 passenger hours per hour each way at peak traffic times). The total length of line 1 is about 23 km and will have 24 stations to provide easy access to the city's major commercial and administrative centers. The travel time, including stops at stations, will be about 40 minutes.

More: Ahvaz Metro
Tabriz

Metro - Under Construction



Quote:
Tabriz (1.2 mill. inh.) is the centre of north western Iran. An east-west metro line is under construction, passing underneath the historical quarters of the city. The first phase with 6 kms is planned to open at the end of the Iranian year (March 21) and is predicted to carry 20 000 Passengers per hour in both directions.

Map



More: Tabriz Metro
Shiraz

Metro - Under Construction



Quote:
The “Shiraz Urban Railway Plan” was approved in Esphand of 1380 (May 1999). It currently has 3 lines in construction which together are approximatley 46km long:

- The first line routes from south east (Gole Sorkh) to north east (Ehsan Sq. & Mirza Koochak Khan).

- Second line route from Imam Hossein Sq. to Adel Abad & Mian Rood.

- Third line route. From Mirza Koochak Khan Sq. to Sadra new town.


The length of the Line 1 will be 22.4 Km, the main depot (Rerpair and Parking) is located about 1,300 meter south east of Gol e Sorkh Sq. Line 1 has 20 underground stations and 1 station above the ground. This line passes through municipality territories and real estates (streets, side walks…)

Line one and Line two will have a crossed station at Emam Hossein Sq. Line one and Line three also have two linked stations at Mirza Kuchak Khan Sq.

There will be 10 stations on Line two, 8 underground and 2 stations are above the ground. on Line 3, there will be 8 stations out of which 4 stations are underground and 3 stations above the ground, and one special station which will be connected to the State Railroad (Esfahan – Shiraz) terminal near Golestan Town.







More: Shiraz Metro
Esfahan

Metro - Under construction



Quote:
Esfahan (Isfahan) lies in central Iran, some 400 km south of Tehran, and has a metropolitan population of more than 2 million.

The North-South Line run through the city centre from a terminal and depot near the existing Kaveh intercity bus terminal to the Soffeh intercity bus terminal. It runs along the wide Chahrbagh Boulevard. The total length of this line is 12.5 kilometres, with 12.0 kilometres underground. There are 15 stations, (all underground). The Zayandeh Rud river is also crossed in a tunnel. This line has been under construction since 2001 was supposed to be finished by 2005.

From Azadi station another line will start underground and immediately after leaving the station will run on the surface towards the south-west as a regional light rail line, mostly on separate right-of-way, to Pooladshahr and Majlesi. The total length of this line will be 43 km (0.7 km underground and 9.6 km elevated) with 13 stations






More: Esfahan Metro
Mashad

Tram - Under Construction



Quote:
The city of Mashad with a population of 2,2 milions has planned a light rail network. Works for the first line have started in 1999. The line will extend for 18km in north-west direction, with 22 stations, with 9km and 11 stations underground. According to news sources this project is 90% completed.








More: Mashad Light Rail
nebuchadnezzar is offline   Reply With Quote
Old 26th October 2006, 14:46   #2
Moderator
 
Shay-One's Avatar
 
Join Date: Sep 2006
Location: Tehran/Luxembourg
Posts: 270
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 Shay-One is on a distinguished road
Points: 1,159, Level: 18 Points: 1,159, Level: 18 Points: 1,159, Level: 18
Level up: 19% Level up: 19% Level up: 19%
Activity: 0% Activity: 0% Activity: 0%
Default

Very nice. But where does it mention tram ? I gotta say I'd love to see a tram in Tehran
Shay-One is offline   Reply With Quote
Old 27th October 2006, 11:16   #3
Senior Member
 
Join Date: Oct 2006
Posts: 206
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 nebuchadnezzar is on a distinguished road
Points: 822, Level: 15 Points: 822, Level: 15 Points: 822, Level: 15
Level up: 16% Level up: 16% Level up: 16%
Activity: 0% Activity: 0% Activity: 0%
Default

Light trail/tram in mashhad, but it goes underground in some places.
nebuchadnezzar is offline   Reply With Quote
Old 27th October 2006, 16:13   #4
Moderator
 
Shay-One's Avatar
 
Join Date: Sep 2006
Location: Tehran/Luxembourg
Posts: 270
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 Shay-One is on a distinguished road
Points: 1,159, Level: 18 Points: 1,159, Level: 18 Points: 1,159, Level: 18
Level up: 19% Level up: 19% Level up: 19%
Activity: 0% Activity: 0% Activity: 0%
Default

I see, good to know !
Shay-One is offline   Reply With Quote
Old 29th October 2006, 09:05   #5
Kuvvaci
 
RWC-04's Avatar
 
Join Date: Sep 2006
Location: Istanbul
Posts: 1,438
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 4 RWC-04 will become famous soon enough
Points: 4,242, Level: 41 Points: 4,242, Level: 41 Points: 4,242, Level: 41
Level up: 42% Level up: 42% Level up: 42%
Activity: 0% Activity: 0% Activity: 0%
Default

wonderful projects

I espacially liked Tebriz. Please post this thread at the main forums...
RWC-04 is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 05:51.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214