Old 20th July 2008, 14:16   #6
Build the Freedom Tower!
 
Daquan13's Avatar
 
Join Date: Aug 2007
Posts: 441
Thanks: 4
Thanked 9 Times in 9 Posts
Rep Power: 3 Daquan13 is on a distinguished road
Points: 1,867, Level: 25 Points: 1,867, Level: 25 Points: 1,867, Level: 25
Level up: 26% Level up: 26% Level up: 26%
Activity: 0% Activity: 0% Activity: 0%
Default

Thanks, Regimen. you're a genius!!
Daquan13 is offline   Reply With Quote
The Following User Says Thank You to Daquan13 For This Useful Post:
Reignman  (20th July 2008)
SkyScraperLife
Old 28th August 2008, 21:53   #7
Refugee
 
TalB's Avatar
 
Join Date: May 2008
Location: Pleasantville, NY
Posts: 1,125
Thanks: 0
Thanked 36 Times in 30 Posts
Rep Power: 3 TalB is on a distinguished road
Points: 2,646, Level: 31 Points: 2,646, Level: 31 Points: 2,646, Level: 31
Level up: 32% Level up: 32% Level up: 32%
Activity: 0% Activity: 0% Activity: 0%
Default

http://www.nytimes.com/2008/08/28/ny...l?ref=nyregion
Transit Hub Design May Be Simplified

By DAVID W. DUNLAP
Published: August 27, 2008

As one architectural ambition after another was given up at ground zero for economy, security and politics, it seemed that the architect Santiago Calatrava’s vision of a luminous, cavernous World Trade Center Transportation Hub would be immune from major change.

No more.

With the Port Authority of New York and New Jersey seeking significant savings in the budget and the timetable of the trade center reconstruction, a key element of Mr. Calatrava’s design —a vast underground mezzanine free of columns — may be in jeopardy.

Estimates vary on how much the projected cost of the transportation hub currently exceeds its $2.5 billion budget, but it could be at least several hundred million dollars.

Spanning great spaces without the interruption of columns is certainly possible and, all else being equal, aesthetically desirable. But it also adds to the complexity of construction.

Two alternatives under consideration call for standard column-and-beam construction instead of the long spans and cantilevers proposed by Mr. Calatrava.

For his part, Mr. Calatrava says his design can be constructed on budget and on time, noting that there had already been revisions made to it without abandoning the columnless approach.

“It has always been my goal to deliver a beautiful, practical transportation hub for Lower Manhattan,” he said in a statement released by his office. “In its revised state, the project retains all of its fundamental beauty, and the adjustments make it an ever-more-functional and coherent facility that will serve New York well in the years to come.”

No version would eliminate the ribbed and winged roof over the hub’s arrival hall, east of Greenwich Street, which Mr. Calatrava has likened to a bird in flight. Keeping it would permit officials to assert that they had been faithful to the original architectural concept.

But it is the underground mezzanine, west of Greenwich Street, that will be the functional heart of the hub, occupying the level between the arrival hall and the PATH platforms. How it is treated depends in part on whether it is seen as a passageway through which commuters hurry or as a ceremonial gateway on the scale of the main concourse at Grand Central Terminal.

At the tightly squeezed trade center site, how the mezzanine is constructed has an effect on all the buildings around it. Directly above it would be one corner of the 9/11 memorial plaza. Adjoining it would be the lower level of Tower 3, a 71-story office tower being developed by Silverstein Properties. Running through it would be the tracks and station of the No. 1 subway.

At the end of September, Christopher O. Ward, the executive director of the Port Authority, is to report to the authority’s board on how the agency intends to resolve the numerous logistical, structural and financial conflicts that have stalled progress and raised costs at ground zero.

In the case of the hub, the authority must balance its fiduciary role with its role as advocate for Mr. Calatrava’s plan.

The three conceptual versions of the transportation hub under discussion are:

¶The revised version of the original design in which Mr. Calatrava and his partners in the Downtown Design Partnership, the firms STV and DMJM, have been directly involved. This version would maintain the mezzanine as an uninterrupted, column-free space.

¶An alternative calling for reuse of existing columns. This has been advanced by a group convened to help Mr. Ward in his assessment. It is headed by Mickey Kupperman, an executive at Silverstein, and has involved the Turner Construction Company, the architectural firm Beyer Blinder Belle and the engineering firms AKF and Leslie E. Robertson Associates.

¶An alternative that would use what the authority describes as “a more traditional column-supported structural approach to the PATH mezzanine.” This has been developed by a team led by the authority’s chief engineer, Francis J. Lombardi.

It is too early to say which approach, or which combination, will prevail.

“The whole point of the report is to answer these questions and move forward,” said Stephen Sigmund, a spokesman for the authority. He said the authority was working with Mr. Calatrava “to preserve as much of his original vision” as possible but added, “These aren’t easy fixes.”

Joseph C. Daniels, the president and chief executive of the National September 11 Memorial and Museum, said on Wednesday that to have the plaza ready for visitors by the 10th anniversary of the attack, the steel and concrete framework of the mezzanine below must be completed by July 2010.

“Everything has to be done to make that date,” he said.
__________________
I have respected your views, so I expect you to do the same for me.
TalB is offline   Reply With Quote
Old 30th August 2008, 00:47   #8
Refugee
 
TalB's Avatar
 
Join Date: May 2008
Location: Pleasantville, NY
Posts: 1,125
Thanks: 0
Thanked 36 Times in 30 Posts
Rep Power: 3 TalB is on a distinguished road
Points: 2,646, Level: 31 Points: 2,646, Level: 31 Points: 2,646, Level: 31
Level up: 32% Level up: 32% Level up: 32%
Activity: 0% Activity: 0% Activity: 0%
Default

Wait for W.T.C. trains may be at least 8 years
Volume 21, Number 15 | The Newspaper of Lower Manhattan | August 22 - 28, 2008

Wait for W.T.C. trains may be at least 8 years

By Julie Shapiro

The World Trade Center PATH hub will not open until 2016, according to a February 2007 engineering study, a portion of which was obtained by Downtown Express.

The study also pins the completion of Tower 3 at 2014 and Tower 2 at 2015 — two and three years later than Tower 4, which is located farther from the hub.

Since officials are now pushing to speed up the memorial timetable, 2016 may be in effect a bestcase scenario for the PATH station, said a source currently involved in the rebuilding process who spoke to Downtown Express on the condition of anonymity. “The dates could be even longer off,” he said, referring to projects adjacent to the memorial including the hub.

The Lower Manhattan Development Corporation and the Lower Manhattan Construction Command Center commissioned the risk-based study to get a realistic set of completion dates for the World Trade Center projects. The study’s results slashed the Port Authority’s construction timeline, listing delays between several months and five years for every project.

News reports earlier this year revealed L.M.D.C. warnings of schedule delays in December 2007, but it has not been previously reported that the first warnings came ten months earlier, just as the Spitzer administration was taking over. The Daily News reported that based on a memo in December, the hub would open in 2014, not in 2016 — the year the rebuilding source now thinks may be too optimistic.

The Port Authority has never directly addressed the study’s findings, and Port officials continued repeating unrealistic dates to the public for more than a year after the study was completed.

When Gov. David Paterson asked Chris Ward, the Port’s new executive director, to examine the W.T.C. rebuilding schedule in June, Ward did his own study and came up with dates similar to the ones the L.M.D.C. had found early in 2007, a Downtown real estate source said.

“That’s when they realized, ‘We’ve got a big problem on our hands,’” the source said.

The L.M.D.C.’s 2007 study also says the Freedom Tower will not open until 2014 and the memorial museum will not open until 2015.

Ward is working with the World Trade Center stakeholders to prepare a new timetable, which he will release by Sept. 30. His goal is to bring the projects closer to their original schedules and budgets.

Julie Menin, chairperson of Community Board 1, said she doesn’t have to look far to predict what the impact of the site’s delays will be.

“The impact is already there,” she said, referring to small businesses that are counting on foot traffic from the rebuilt W.T.C. “People’s faith and confidence in the neighborhood ends up being shaken.”

Steve Coleman, a spokesperson for the Port Authority, said this week that the 2007 study is more of a worst-case scenario than a timeline, and he declined to comment on whether the study’s dates are still realistic estimates.

“It would be premature to guesstimate on specific timetables [before Ward gives his report],” Coleman said. “That’s what [officials] did before — they guesstimated and then they had to redo them all.”

The biggest source of the delays is the fact that each project overlaps with others.

“Everything is tied in together,” said the source currently involved in the rebuilding. For example, construction on one project may require the Port Authority to use another part of the site as a staging area, preventing work from moving forward there.

When two projects conflicted, the 2007 study prioritized the project that was closer to completion.

Ward’s Steering Committee is looking at potential conflicts to decide on priorities for the site. The top priority, the Steering Committee decided, will be to open the permanent memorial, including the reflecting pools in the tower footprints, by the 10th anniversary of the 9/11 attacks, several sources said.

But Menin, who is also on the board of the National September 11 Memorial & Museum, heard that the Port Authority was thinking of opening the memorial temporarily and then closing it, which she said was not acceptable.

“In this society, dates matter,” said Joe Daniels, president of the memorial organization. “They’re symbolic, but there’s meaning behind the symbolism…. We have three years to finish the building of the memorial. The bottom line is we should be able to do it.”

But Daniels won’t be able to open the memorial on time unless the Port Authority agrees to redesign a belowground portion of the PATH hub, he said.

The northeast corner of the memorial plaza sits atop the underground PATH station. Daniels needs the Port Authority to put the roof on that part of the PATH station by July 2010 if he is going to finish the tree-studded memorial by 9/11/11. The problem is that current designs for the underground PATH hall would require the roof to stay off for much longer, preventing Daniels from opening the plaza on time. Ward’s Steering Committee has to decide whether they want to redesign the PATH hall to allow the memorial work to happen earlier.

“That’s the most important decision we need to have made,” Daniels said.

If he wins that battle, his next challenge will be figuring out how to open the memorial in the midst of a construction site, without the infrastructure that the finished World Trade Center will have. The questions abound: How will pedestrians access the secure site? Where will tour buses drop off the millions of visitors expected and park? How will visitors be kept safe as five Empire State Buildings rise around them?

Daniels doesn’t know the final answers to these questions yet, but he said construction happens every day in this densely packed city, and while the challenges will take work to resolve, he said they are manageable. One possibility is creating a buffer zone between the memorial and the construction.

Once the memorial issues are resolved, the next thing on Daniels’s plate is getting the 9/11 memorial museum open. The L.M.D.C.’s 2007 report said the museum would not open until 2015, but Daniels is pushing for a 2012 opening date. He recognizes that that will require another slew of coordination decisions, which will be more complex because the memorial is underground.

Ward’s Steering Committee has met three times to weigh options for the W.T.C. site, and the project causing the most difficulty is Santiago Calatrava’s PATH hub, a Downtown real estate source said.

“People think of the above-grade oculus, but that’s just the tip of the iceberg,” the source said. “The whole PATH infrastructure is connected to every part of the site.”

The design by Calatrava, an artist, architect and engineer, is patterned after a bird in flight and was the most universally praised W.T.C. design when it was unveiled nearly five years ago.

The steel to build it will have to come from Spain, because no one in the United States can manufacture it, the source said. No two pieces of steel in the design are the same, so putting the pieces together is akin to “a giant jigsaw puzzle,” he said. That’s true of the below-ground parts in addition to the above-ground wings.

“A lot of what makes it beautiful is its uniqueness, which is fine if you’re building a sculpture, but tricky if you’re building a train station,” the source said. “The Port Authority is working around the clock to try to fix the problem.”

One of the key proposals in the L.M.D.C.’s 2007 report was to simplify the design for the PATH station, which would save money and allow other projects to move forward, the report says.

The design of the PATH station is also one of the 15 issues the Port has pledged to resolve by the end of September. Ward has already announced that Calatrava’s white wings will no longer open.

The complexities and delays predicted for the PATH station had a ripple effect on the surrounding projects in the L.M.D.C.’s 2007 study. The reason Towers 2 and 3 were delayed is because they abut the PATH hub, a Downtown real estate source said. Tower 4 faced only a year-long delay, to 2012, because it is farther from the PATH station, the source said.

Silverstein Properties and the L.M.D.C. declined to comment for this article.

The February 2007 study also noted a delay on the demolition of 130 Liberty St., the former Deutsche Bank building. The L.M.D.C. had promised the building would be down by the end of 2007, but the study lists April 2008 as the revised date. However, for months after the study was completed, the L.M.D.C. continued to publicly state that the building would be down by the end of 2007, despite growing skepticism of C.B. 1 members. A fire at the Deutsche Bank building in August 2007 killed two firefighters and delayed the demolition goal to the middle of 2009.

With all the discussion about future deadlines, there’s one looming over the Port Authority right now — and an expensive one at that.

The Port Authority was supposed to turn the excavated site for Tower 2 over to Silverstein Properties by July 1, and the Port has been paying Silverstein a $300,000-a-day penalty since then. The Port has since said they would complete the excavation work by the end of August, but now the clock is ticking down on that revised deadline as well.

“We’re working to meet the deadline,” Coleman, the Port spokesperson, said Wednesday. He would not say whether the Sunday deadline was realistic.

Ward, the Port’s executive director, has said that he would use previous studies of the World Trade Center site’s timetable to inform his work this summer. He apparently has already taken one of the February 2007 study’s recommendations to heart: The study recommends creating a group of project stakeholders, led by the Port Authority, to make decisions about the site. The Steering Committee Ward announced last June is just that, though Ward declined to say then who was in charge of it.

The “committee of stakeholders” structure is very different from the chain of command back when Guy Tozzoli was running the show in the 1960s, ’70s and ’80s.

Tozzoli, now 86, was director of the Port’s World Trade Department, charged with planning, designing, building, renting and operating the World Trade Center.

“When I was in charge, I was in charge of everything,” Tozzoli told Downtown Express this week. “It was easy — I was the guy they came to.”

People familiar with the Steering Committee’s work this summer agreed that the Calatrava hub will face some design changes, but Ward appeared to be hinting that even more drastic changes were on the horizon during a speech at 7 W.T.C. two weeks ago. Although the speech focused on continuing regional economic growth in an environmentally friendly way, Ward closed by mentioning renowned architect Cass Gilbert — perhaps the Santiago Calatrava of nearly a century ago.

Ward showed a rendering of Gilbert’s original and never-built 1926 drawings of the George Washington Bridge with majestic stone arches. Then he showed a picture of the present-day bridge, which was designed by engineer Othmar Ammann. When the bridge opened in 1931 it was derided as “less than first class” and an embarrassing version of what could have been, Ward said, but today, the bridge’s design is considered an architectural marvel.

He said the lesson is that even within budgets, “we can still build greatness.”

With reporting
by Josh Rogers
__________________
I have respected your views, so I expect you to do the same for me.
TalB is offline   Reply With Quote
Old 1st September 2008, 22:47   #9
Build the Freedom Tower!
 
Daquan13's Avatar
 
Join Date: Aug 2007
Posts: 441
Thanks: 4
Thanked 9 Times in 9 Posts
Rep Power: 3 Daquan13 is on a distinguished road
Points: 1,867, Level: 25 Points: 1,867, Level: 25 Points: 1,867, Level: 25
Level up: 26% Level up: 26% Level up: 26%
Activity: 0% Activity: 0% Activity: 0%
Default

Do they honestly know what they are talking about?

That statement was made back in '07. Things could have xhanged since then.
Daquan13 is offline   Reply With Quote
Old 18th September 2008, 20:28   #10
Refugee
 
TalB's Avatar
 
Join Date: May 2008
Location: Pleasantville, NY
Posts: 1,125
Thanks: 0
Thanked 36 Times in 30 Posts
Rep Power: 3 TalB is on a distinguished road
Points: 2,646, Level: 31 Points: 2,646, Level: 31 Points: 2,646, Level: 31
Level up: 32% Level up: 32% Level up: 32%
Activity: 0% Activity: 0% Activity: 0%
Default

Fate of the Calatrava Terminal Is Still Hanging - City Room - Metro - New York Times Blog
September 17, 2008, 9:35 am

Fate of the Calatrava Terminal Is Still Hanging

By David W. Dunlap


Anthony J. Sartor, far left, and David S. Steiner, far right, were the two Port Authority commissioners who defended Santiago Calatrava’s design for the World Trade Center Transportation Hub at a board meeting on Tuesday. Between them are Anthony R. Coscia, the authority chairman, and Raymond M. Pocino, another commissioner. (Photo: David. W. Dunlap/The New York Times)

With two weeks to go before he must make more than a dozen recommendations on how to get ground zero rebuilding on schedule and on budget, the executive director of the Port Authority said on Tuesday that he had not yet solved the linchpin problem: how to build the underground mezzanine of the World Trade Center Transportation Hub.

The executive director, Christopher O. Ward, told the commissioners of the Port Authority of New York and New Jersey that he was still confident he would meet the Sept. 29 deadline for delivery of his report. But Mr. Ward, who can be disarmingly candid, acknowledged that his own deadline for setting deadlines had been perhaps “overly ambitious.”

What makes the mezzanine so critical is that its schedule dictates the schedule of the memorial, because one large corner of the memorial plaza is directly above the mezzanine. Construction of the mezzanine also affects the completion of Greenwich Street, which runs in front of the three office towers planned by Silverstein Properties.

Santiago Calatrava, the architect of the transportation hub, has called for a mezzanine with uninterrupted space, depending on long-span arches and cantilevers to avoid the use of columns. A second proposal, from a working group led by a Silverstein Properties executive, proposes standard column-and-beam construction and the insertion of another floor within the space. A third proposal, developed in-house by the Port Authority, would retain some of the spaciousness of the mezzanine, but also use columns and beams.

The key question is whether Mr. Calatrava’s seemingly exotic design can be constructed timely and economically.

Mayor Michael R. Bloomberg said last week that the transportation hub design, “including the underground hall, is too complicated to build and threatens to delay the memorial and the entire project.”

But two of the authority’s commissioners, Anthony J. Sartor and David S. Steiner, sought on Tuesday to refute that idea by citing an arched east-west underground passageway that has already been built to Mr. Calatrava’s specifications. They took turns at the board meeting questioning Steven P. Plate, the director of priority capital programs at the authority.

When asked about prices for the east-west passageway, Mr. Plate replied, “Based on the estimates that we had, the actual numbers came in consistent or lower than the original estimates.”

When asked about construction difficulties, he answered, “It went without any hitches.”
Mr. Sartor and Mr. Steiner, both of whom represent New Jersey in the bistate authority, have long been advocates for Mr. Calatrava’s design. They did not have to do anything more than ask their questions in a public meeting to make their point.

Mr. Bloomberg, who is also chairman of the National September 11 Memorial and Museum at the World Trade Center, has insisted that the memorial be completed by Sept. 11, 2011, the 10th anniversary of the attack.

Tuesday marked the first time the Port Authority board of commissioners met to discuss the World Trade Center project exclusively. The meeting was held at 115 Broadway, between Cedar and Thames Streets. The 10th-floor conference room into which the commissioners crowded had a view that took in much of ground zero.

After the brief meeting, Mr. Ward said about the transportation hub design: “There is much analysis in terms of engineering, constructability, delivery and time. And literally in this building, around the clock, Port Authority engineers work with our project and architectural partners on evaluating that.”

Asked whether such a complex and sophisticated engineering analysis could be performed in two weeks, Mr. Ward said, “The answer to that is yes.”

Then he smiled and added, “As I could only answer yes.”
__________________
I have respected your views, so I expect you to do the same for me.
TalB is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 08:30.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0

SkyScraperLife.Com
2006 - 2009
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255