![]() |
|
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| | #21 | |||||||||||
| TheBest/Venezuelan/Member ![]() Join Date: Oct 2006 Location: Valencia, Venezuela
Posts: 236
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]()
| Demasiado zorra, eres la peor! | |||||||||||
| | |
| | #22 | |||||||||||
| Venezolano 100% ![]() Join Date: Oct 2006 Location: Caracas, Venezuela
Posts: 207
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]()
| I dont ****ing care. Te molestaría si te quitara el thread del Valmetro... Ademas esta vaina está peorra. Me tiraré uno de calidad.
__________________ Orgullo VENEZOLANO, orgullo CARAQUEÑO M|M|M|M|T |T | |||||||||||
| | |
| | #23 | ||||||||||||
| TheBest/Venezuelan/Member ![]() Join Date: Oct 2006 Location: Valencia, Venezuela
Posts: 236
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]()
| Quote:
En fin te amo y nunca dejaré de hacerlo. (solo cuando te atrevas a robarte algún thread mio, zorra) | ||||||||||||
| | |
| | #24 | ||||||||||||
| Bye ![]() Join Date: Oct 2006
Posts: 2,799
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 5
| Quote:
Jajajaja hay que ver que ustedes hasta por threads se desgreñan. | ||||||||||||
| | |
| | #25 | |||||||||||
| TheBest/Venezuelan/Member ![]() Join Date: Oct 2006 Location: Valencia, Venezuela
Posts: 236
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]()
| Pics thanks to WG-85 LINE 3 EXTENSION And tomorrowLine 3 extension that connect La Rinconada (METRO DE CARACAS) Station with the Libertador Simon Bolívar Station (Caracas Station of the National Train System) line Caracas-Charallave-Cua: ![]() ![]() ![]() ![]() ![]() Fotos durante la construcción Inversion on US$ Millions US $815,47 Works descriptions 5,9 Km long 4 Stations (Los Jardines, Coche, Mercado and La Rinconada) 9 Tunels Social Impac This is the begginin that links the Caracas Metro with the National Train System. Is gonna receive to the people that come to Caracas from Valles del Tuy. Eventually is going to reduce the car traffic on the HW and help to the passenger redistribution on line 1 and 2 of the Metro. Jobs Generated Direct 6.000 Indirect 7.000 Expected users per day 260.000 | |||||||||||
| | |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
| |