Go Back   SkyScraperLife > Global Skyscraper Discussion Forums > General Architecture > Mass Transit & Transportation
Connect with Facebook
Register FAQ Members List Calendar Mark Forums Read

Reply
 
LinkBack Thread Tools Display Modes
Old 9th October 2006, 21:47   #1
Simple Member
 
skylinearth's Avatar
 
Join Date: Oct 2006
Location: Thessaloniki, Greece
Posts: 158
Thanks: 0
Thanked 1 Time in 1 Post
Rep Power: 4 skylinearth is on a distinguished road
Points: 1,230, Level: 19 Points: 1,230, Level: 19 Points: 1,230, Level: 19
Level up: 20% Level up: 20% Level up: 20%
Activity: 0% Activity: 0% Activity: 0%
Default Thessaloniki metro system (under construction)

The construction of the Thessaloniki metro started in June 2006 and it should be completed by 2012. The first phase of the project consists of 9.6 km of underground line with thirteen stations, and a depot at the east end of the line. The budget of the project is about 1.1 billion Euro.

Thessaloniki's metro will be similar to the Copenhagen Metro. It will feature eighteen driver-less trains that will run in separate tunnels in each direction. There will also be glass walls with automatic doors on the edge of platforms, in every station, for added safety. The project is being constructed by a Greek-Italian consortium and overseen by Attiko Metro, the company that manages the Athens Metro.
In Aug. 2005, Public Works Minister Giorgos Souflias said the 800-million-euro tender to build the 9-km line with 13 stations had been awarded to a Greek-Italian consortium, headed by domestic firm AEGEK, which would begin work as soon as the legal paperwork had been completed. Souflias said it was possible that other bidders might appeal against the award.

March 2006: Long-awaited Thessaloniki metro works to begin in May Construction work to build a long-proposed metro system in the northern city of Thessaloniki will begin in May after whatever obstacles in a tender procedure have been cleared up by the European Union, Public Works Minister George Souflias said on Monday. Speaking to reporters, the minister said the project was expected to be ready in 2012. It will feature 9.5 km of lines with 13 stations.

7 April 2006: Contract signed between Attiko Metro and Ansaldobreda/Ansaldo STS.

28 July 2006: Excavation with TBMs starts in the west of the city near new central station.

... to be continued ...





3D animation of Thessaloniki metro stations:http://www.youtube.com/watch?v=XTdvAEV9tVA

Stations planned

* New Railway Station
* Dimokratias
* Venizelou
* Agia Sofia
* Syntrivani
* Panepistimio (University)
* Papafi
* Efklidi
* Fleming
* Analipseos
* Patrikiou
* Voulgari
* Nea Elvetia
* (Pylaia depot)

Extensions

Future extensions to Kalamaria (to the south) and Stavroupoli (to the north) are in the early stages of planning and designing. Further extensions to Kordelio (to the northwest) and to the airport (on the southeast) are under consideration.
skylinearth is offline   Reply With Quote
SkyScraperLife
Old 9th October 2006, 21:54   #2
Lew
FILIPINAS de ASYA
 
Lew's Avatar
 
Join Date: Oct 2006
Posts: 352
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 Lew is an unknown quantity at this point
Points: 1,074, Level: 17 Points: 1,074, Level: 17 Points: 1,074, Level: 17
Level up: 18% Level up: 18% Level up: 18%
Activity: 0% Activity: 0% Activity: 0%
Default

So this is go@ing to be a subway..
Lew is offline   Reply With Quote
Old 9th October 2006, 22:13   #3
Moderator
 
meow's Avatar
 
Join Date: Sep 2006
Location: İstanbul
Posts: 1,756
Thanks: 0
Thanked 1 Time in 1 Post
Rep Power: 5 meow has a spectacular aura about
Points: 7,109, Level: 55 Points: 7,109, Level: 55 Points: 7,109, Level: 55
Level up: 56% Level up: 56% Level up: 56%
Activity: 0% Activity: 0% Activity: 0%
Default

late is better than never

but isn't it too costly?
1.1 billion for 9.5 km??
meow is offline   Reply With Quote
Old 9th October 2006, 22:15   #4
Lew
FILIPINAS de ASYA
 
Lew's Avatar
 
Join Date: Oct 2006
Posts: 352
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 Lew is an unknown quantity at this point
Points: 1,074, Level: 17 Points: 1,074, Level: 17 Points: 1,074, Level: 17
Level up: 18% Level up: 18% Level up: 18%
Activity: 0% Activity: 0% Activity: 0%
Default

yeah.. i find it very expensive too.
Lew is offline   Reply With Quote
Old 10th October 2006, 03:29   #5
For the glory of Greece
 
Giorgos's Avatar
 
Join Date: Sep 2006
Location: Adelaide, Australia
Posts: 636
Thanks: 0
Thanked 1 Time in 1 Post
Rep Power: 4 Giorgos is on a distinguished road
Points: 2,256, Level: 28 Points: 2,256, Level: 28 Points: 2,256, Level: 28
Level up: 29% Level up: 29% Level up: 29%
Activity: 0% Activity: 0% Activity: 0%
Default

Um, but it will be underground.
Do you know how much it costs to build underground and especially in Greece where they have to watch out for all the ancient artifacts.
Giorgos is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 10:57.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0

SkyScraperLife.Com
2006 - 2009
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255