Old 19th December 2006, 02:10   #11
Premium Member
 
kuquito's Avatar
 
Join Date: Dec 2006
Location: TORONTO
Posts: 3,637
Thanks: 20
Thanked 18 Times in 15 Posts
Rep Power: 5 kuquito will become famous soon enough
Points: 6,620, Level: 53 Points: 6,620, Level: 53 Points: 6,620, Level: 53
Level up: 54% Level up: 54% Level up: 54%
Activity: 0% Activity: 0% Activity: 0%
Default impresive!

thanks for the pics!

very impressive transit system. Manila must be a huge city to need so many lines

how does the fare system work?.



Quote:
Originally Posted by Occit View Post
Is very, very similar...specially, the roof:

Araneta Station, Manila



vs

Caņo Amarillo Station, Caracas



__________________
UN SIGLO AMANDOTE
kuquito is offline   Reply With Quote
Old 6th January 2007, 16:38   #12
Lew
FILIPINAS de ASYA
 
Lew's Avatar
 
Join Date: Oct 2006
Posts: 352
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 Lew is an unknown quantity at this point
Points: 1,074, Level: 17 Points: 1,074, Level: 17 Points: 1,074, Level: 17
Level up: 18% Level up: 18% Level up: 18%
Activity: 0% Activity: 0% Activity: 0%
Default

Quote:
Originally Posted by kuquito View Post
thanks for the pics!

very impressive transit system. Manila must be a huge city to need so many lines

how does the fare system work?.



you buy your mrt card here.. all the lines operational have integrated ticketing system..
Lew is offline   Reply With Quote
Old 29th June 2007, 01:42   #13
Lew
FILIPINAS de ASYA
 
Lew's Avatar
 
Join Date: Oct 2006
Posts: 352
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 Lew is an unknown quantity at this point
Points: 1,074, Level: 17 Points: 1,074, Level: 17 Points: 1,074, Level: 17
Level up: 18% Level up: 18% Level up: 18%
Activity: 0% Activity: 0% Activity: 0%
Default

Quote:
Originally Posted by soulmaker27 View Post
I am not sure if these had been posted already. But it seems that the government is really bullish in finishing the complete MRT/LRT plans. These slides came from the NEDA website: Comprehensive and Integrated Infrastructure Program (CIIP) NEDA


MRT 7




MRT LRT Loop



LRTA Line 6




MRT 3 Capacity Expansion




LRTA Line 2




LRTA-NAIA Connector

from SSC
Lew is offline   Reply With Quote
Old 29th June 2007, 01:43   #14
Lew
FILIPINAS de ASYA
 
Lew's Avatar
 
Join Date: Oct 2006
Posts: 352
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 Lew is an unknown quantity at this point
Points: 1,074, Level: 17 Points: 1,074, Level: 17 Points: 1,074, Level: 17
Level up: 18% Level up: 18% Level up: 18%
Activity: 0% Activity: 0% Activity: 0%
Default

Metrolink bags P230-M contract for LRT
By Lenie Lectura
Reporter


METROLINK JV has bagged the P230-million consultancy contract for the construction of the North Extension railway project.

Metrolink bested Schema Konsult-DCCD Engineering Corporation-Katahira & Engineers, Asia Inc.-Asia Halcrow Inc. and SPI-JCCS-WCI Joint Venture.

The North Extension Project is estimated to cost P6.57 billion.

All firms were deemed qualified after the submission and opening of their eligibility documents and letters of intent last February. They have proven track records in the rail industry not only in the Philippines but also internationally.

The agency received offers from seven bidders during the prequalification bid but only the three firms were selected.

“Out of the three, we awarded the contract to Metrolink JV a couple of weeks ago. They are composed of Filipino and Japanese firms that are very experienced in this kind of project. They will come up with a feasibility study,” said Light Rail Transit Authority administrator Melquiades Robles in a phone interview.

The North Extension Project will extend the LRT Line 1 to the north, through the construction of a 5.4-kilometer elevated line from the existing Monumento Station to the North Avenue station of the Metro Rail Transit 3. This will close the Edsa loop.

The North Extension is a top priority project of the Arroyo administration. It is expected to serve up to 1 million passengers once it is fully operational.

Robles said the project’s implementation is track and construction of the extension will begin early next year.

The Transit Authority is the implementing agency for this project. Robles said the North Extension railway system is still the cheapest, fastest and most viable option. That’s why President Arroyo entrusted the project’s implementation to their office.

“If undertaken by us, the project will only cost P6.57 billion, since we already have the needed rolling stock and we will only have to construct four stations,” he said.

The Transit Authority has a total fleet of 135 light rail vehicles, including 48 newly inaugurated third-generation trains. It has increased capacity from 27,000 passengers per hour per direction to 40,000.

Other proponents have offered to close the loop for P34.2 billion, Robles said.
Lew is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 00:37.


Powered by vBulletin® Version 3.7.3
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214