Thread: #Gdynia - U/C: Sea Towers complex (116m, 138 to antenna + 91m) - over 100 pics

  1. #6
    NorthPole's Avatar
    Great Ape Project

    Status
    Offline
    Join Date
    Oct 2006
    Location
    3CT, Poland (en.wikipedia.org/wiki/Tricity)
    Posts
    472
    Liked
    0 times
    Rep Power
    11

    Default

    It's still u/c, but will be on hold (in few weeks I guess) for winter season until March (in fact next Friday we will have first temperature below 0 C this year in northern Poland). Also days will be only 4-5 hours long. Then stormy frosty winds will come.
    We are not in ME dude

  2.   
     
  3. #7
    dizo's Avatar
    Tel-Aviv is cool!!!

    Status
    Offline
    Join Date
    Sep 2006
    Location
    Ramat Gan-Tel-Aviv, Israel
    Posts
    3,056
    Liked
    1 times
    Rep Power
    14

    Default

    That means all Warsaw construction will get on-hold???

  4. #8
    NorthPole's Avatar
    Great Ape Project

    Status
    Offline
    Join Date
    Oct 2006
    Location
    3CT, Poland (en.wikipedia.org/wiki/Tricity)
    Posts
    472
    Liked
    0 times
    Rep Power
    11

    Default

    In most cases they will.
    But it's possible to continue works inside buildings, when temerature will not drop too low. For example in GT I bet they will make contruction inside the building (or beneath the dome) and prepare its interior for business.
    But they cannot build up or use concrete outside b/c of frosty weather (concrete doesn't behave well at very low temperatures).

  5. #9
    dizo's Avatar
    Tel-Aviv is cool!!!

    Status
    Offline
    Join Date
    Sep 2006
    Location
    Ramat Gan-Tel-Aviv, Israel
    Posts
    3,056
    Liked
    1 times
    Rep Power
    14

    Default

    Ok!

  6. #10
    NorthPole's Avatar
    Great Ape Project

    Status
    Offline
    Join Date
    Oct 2006
    Location
    3CT, Poland (en.wikipedia.org/wiki/Tricity)
    Posts
    472
    Liked
    0 times
    Rep Power
    11

    Default

    To my surprise they seem to continue all the construction work. According to unconfirmed information (posted by kryszakk@SSC), they intend to build up to 10 floors till end of the year.
    Sounds wery unrealistic, by weather is not so bad as used to be last years during early winter season (Poland is in European transition climatic zone, so we have 4+2 seasons including fading away "przedzimie" = early winter and "przedwiośnie" = early spring season with temperatures between -5ºC and +10ºC with cold/frosty nights and sunny, even relatively warm days).

    2006-11-07 by beczkarz@SSC:


    2006-11-08 by bigosik@SSC:










    Bonus picture of ships moored at Molo Południowe (Southern Pier).
    From right to left: ORP "Błyskawica" (Lightning/Flash), "Dar Pomorza" (Gift of Pomerania), ferry to Hel Peninsula and "Dar Młodzieży" (Gift of the Youth). "Dar" can be also translated as "-send" or "Treasure" depending on how to look on it.


    from Invest Komfort site:
    Last edited by NorthPole; 14th November 2006 at 22:30.

Page 2 of 7 FirstFirst 123456 ... LastLast

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
SkyScraperLife.Com © 2006-2015

World Building Database

Download: Fast, Fun, Awesome - Web Stats