Go Back   SkyScraperLife > Local Skyscraper Forums - Europe > Portugal > Projects, Construction and Infrastructure
Register FAQ Members List Calendar Mark Forums Read

Reply
 
LinkBack (1) Thread Tools Display Modes
Old 20th December 2006, 00:32   #1
Outstanding Member
 
daniel322's Avatar
 
Join Date: Sep 2006
Location: Coimbra
Posts: 1,534
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 daniel322 is on a distinguished road
Points: 4,326, Level: 41 Points: 4,326, Level: 41 Points: 4,326, Level: 41
Level up: 42% Level up: 42% Level up: 42%
Activity: 0% Activity: 0% Activity: 0%
Default Traçado do IC3

Responsáveis políticos dos distritos de Coimbra, Leiria e Santarém e a Estradas de Portugal reuniram ontem, pela segunda vez, para analisar o projecto do IC3.
O futuro traçado para o IC3 pode passar por uma combinação das duas propostas que estão a ser analisadas pela empresa Estradas de Portugal (EP). Ontem, no final de uma reunião, na Lousã, entre vários responsáveis políticos, o governador civil de Coimbra adiantou que, até agora, a hipótese que colhe mais consenso entre as autarquias interessadas é um “traçado combinado”. Ou seja: “até Leiria, o traçado deve desenvolver-se em toda a sua extensão a poente da EN110. Depois, até Coimbra, o troço desenvolve-se a nascente, englobando os concelhos de Miranda, Lousã, Condeixa-a-Nova e Penela”. Recorde-se que uma das propostas de traçado para o IC3, em estudo, desenvolve-se em toda a sua extensão a nascente da EN110, aproximando–se dos concelhos do Interior (contorna Coimbra, pelo lado nascente, atravessa o rio junto às Torres do Mondego e liga ao IP3). A segunda solução desenvolve-se a poente da EN110, aproximando-se dos concelhos de Alvaiázare, Ansião e de Condeixa-a- -Nova.
Com a solução apontada, que engloba as duas propostas, resta agora à Estradas de Portugal elaborar um último projecto, que será depois remetido ao Instituto do Ambiente. “Com base nisso, vamos ter uma última reunião daqui a três meses”, adiantou Henrique Fernandes.
O encontro de ontem - que contou com a presença das autarquias interessadas neste processo e da EP e que foi promovida pelo Governo Civil de Coimbra - quis “tornar mais célere e mais eficaz o processo negocial em termos de traçados”. Ontem, Henrique Fernandes manifestou a sua satisfação. “Parece-me que chegámos a uma solução que abrevia os processos de acerto de vontades e de articulação”, referiu.
A resolução das acessibilidades regionais passa apelo estudo de soluções alternativas para o futuro IC3 que permitam interligar com o sistema viário existente. Pretende-se, desta forma, que o IC3 passe a ser a principal via de penetração do Interior Centro.
Encerrado o processo de audição das partes interessadas, a EP compromete-se a definir as propostas de traçado até ao final do primeiro trimestre do próximo ano. Espera-se que no final de 2007 esteja decidido o traçado definitivo.
__________________
Coimbra
daniel322 is offline   Reply With Quote
Old 22nd December 2006, 18:38   #2
Senior Member
 
fred_mendonca's Avatar
 
Join Date: Sep 2006
Posts: 1,078
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 fred_mendonca is on a distinguished road
Points: 2,931, Level: 33 Points: 2,931, Level: 33 Points: 2,931, Level: 33
Level up: 34% Level up: 34% Level up: 34%
Activity: 0% Activity: 0% Activity: 0%
Default

Era bom se fosse avante de vez!
fred_mendonca is offline   Reply With Quote
Old 22nd December 2006, 22:44   #3
Outstanding Member
 
daniel322's Avatar
 
Join Date: Sep 2006
Location: Coimbra
Posts: 1,534
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 daniel322 is on a distinguished road
Points: 4,326, Level: 41 Points: 4,326, Level: 41 Points: 4,326, Level: 41
Level up: 42% Level up: 42% Level up: 42%
Activity: 0% Activity: 0% Activity: 0%
Default

dava jeito
__________________
Coimbra
daniel322 is offline   Reply With Quote
Old 10th January 2007, 09:06   #4
Junior Member
 
Join Date: Jan 2007
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 rafabento is an unknown quantity at this point
Points: 487, Level: 9 Points: 487, Level: 9 Points: 487, Level: 9
Level up: 10% Level up: 10% Level up: 10%
Activity: 0% Activity: 0% Activity: 0%
Default

podem estar descansados que desta vez é que é!!!
rafabento is offline   Reply With Quote
Old 10th January 2007, 10:27   #5
Outstanding Member
 
daniel322's Avatar
 
Join Date: Sep 2006
Location: Coimbra
Posts: 1,534
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 daniel322 is on a distinguished road
Points: 4,326, Level: 41 Points: 4,326, Level: 41 Points: 4,326, Level: 41
Level up: 42% Level up: 42% Level up: 42%
Activity: 0% Activity: 0% Activity: 0%
Default

bem vindo rafabento

espero bem que sim, apesar de ainda ir demorar uns anos..
__________________
Coimbra
daniel322 is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

LinkBacks (?)
LinkBack to this Thread: http://www.skyscraperlife.com/projects-construction-infrastructure/3017-tracado-do-ic3.html
Posted By For Type Date
*Clix This thread Refback 8th August 2008 09:27


All times are GMT. The time now is 15:18.


Powered by vBulletin® Version 3.7.2
Copyright ©2000 - 2008, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205