| ![]() 1) Welcome clip 2) Clem Jones Flyover. Quote:
Clem Jones Tunnel (NSBT) is Queenslands largest ever project. The tunnel is the longest in Australia. ![]() ![]() Newsroom - Brisbane City Council The NSBT will: * address existing and predicted future congestion levels in and around the city * remove a significant amount of vehicles from the existing surface roads in the city * complete a CBD bypass and inner city ring road system * deliver a better network for pedestrians, cyclists and public transport * free up road space to enable opportunities for public transport and other modes of transport along the NSBT corridor * save motorists up to 15 minutes on a cross-city trip and reduce the peak-hour travel time across the City * enable motorists to avoid 18 sets of traffic lights * improve air quality in the city by reducing surface traffic * enable regeneration of urban centres in Woolloongabba, Bowen Hills and Kangaroo Point * employ more than 1,200 people at the peak of construction * allow the people of Brisbane and Queensland to invest in the road through a public share offer * include state of the art electronic tolling, interoperable with other Australian electronic toll roads * create new standards in tolling customer service, particularly in convenience, flexibility and transparency. ![]() ![]() ![]() ![]() ![]() NSBT CONNECTIONS The Northern distributor ( Via ICB )... ![]() The Southern access point ( Via Pacific motorway ) Zoom up... ![]() The Central access point ( Via Shafston Avenue ) ![]() Zoom ![]() All ![]() Latest News!! ![]() ![]() WORLD’S BIGGEST HARD-ROCK TUNNELLING MACHINE HEADING TO BRISBANE 3 MONTHS EARLY on-site and commence tunnelling in December 2007, well ahead of the original construction program of March 2008. RiverCity Motorway Chief Executive Officer, Flan Cleary, said the early manufacture and delivery of the 4000-tonne tunnel boring machine was another key milestone for the project. It follows the commencement of roadheader excavation in February 2007, two months ahead of schedule. “With a 12.4 metre diameter cutting head, equivalent to a 4-storey building, and a body that is 250 metres long these machines truly are tunnelling juggernauts,” Mr Cleary said. “Each machine weighs as much as 2,350 family cars. The task ahead of them is just as enormous when you consider that we will be excavating enough rock to fill the Brisbane Cricket Ground (the Gabba) nine times over.” Approximately 3.5 million tonnes of rock will be removed to construct Brisbane’s first major road tunnel. Two hard-rock, double-shield tunnel boring machines will complete up to 70 percent of all excavation, with seven roadheaders being used for the remaining works. Mr Cleary said the manufacture of the second tunnel boring machine was currently three months ahead of schedule, with plans for this machine to commence excavation in March 2008. Each machine will start on the north side of the Brisbane River at Bowen Hills and travel south, finishing at Woolloongabba. Mr Cleary said the German manufacturer of the tunnel boring machines, Herrenknecht, had been designing and manufacturing the tunnel boring machines since August 2006. “The machines are being purpose-built to meet the specific requirements of the project and the geological conditions along the North-South Bypass Tunnel route,” he said. “By selecting double-shield machines we are able to excavate rock and place the concrete tunnel lining at the same time. This means the tunnelling operation is both efficient and safe.” A team of 21 people per shift will operate each tunnel boring machine 24-hours per day, Each machine is expected to advance up to 20 metres per day. The North-South Bypass Tunnel is part of Lord Mayor Campbell Newman’s long-term plan to improve Brisbane’s transport network by providing new river crossings and connecting existing motorways and major arterial roads. Last edited by SoulVision; 16th July 2008 at 13:46. | ||||||||||||
| | |
| | #2 | |||||||||||
| Aussie Mod ![]() Join Date: Oct 2006 Location: Adelaide, Australia
Posts: 499
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| wow, this is gonna be huge. i like the entrance, kind of reminds me of SC station in melbourne
__________________ | |||||||||||
| | |
| | #3 | |||||||||||
| Optimist ![]() Join Date: Oct 2006 Location: Brisbane, Queensland, Australia
Posts: 3,493
Thanks: 510
Thanked 282 Times in 147 Posts
Rep Power: 6 ![]()
| yeah very arty isn't it... | |||||||||||
| | |
| | #4 | |||||||||||
| SkyLife ![]() Join Date: Nov 2006 Location: Adelaide, Australia
Posts: 468
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| That is one big tunnel (for Australian standards) and I agree with Mants on its roof design. I'm actually surprised its only 2 lanes in width, because considering SEQ population growth, there would be a substantial increase in traffic congestion, which would undoubtedly place the NSBT under pressure upon its opening. | |||||||||||
| | |
| | #5 | |||||||||||
| Optimist ![]() Join Date: Oct 2006 Location: Brisbane, Queensland, Australia
Posts: 3,493
Thanks: 510
Thanked 282 Times in 147 Posts
Rep Power: 6 ![]()
| Yeah... the loosing bid was a design for 3 lanes for only 20 million more! an extra 20 million is nothing compared to the 2 billion cost of it. I actually hoped for a 2 lane 2 rail tunnel... but that never happened. | |||||||||||
| | |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
| |
| LinkBack to this Thread: http://www.skyscraperlife.com/queensland-main-forum/2689-u-c-clem7-rivercity-motorway-consortium.html | ||||
| Posted By | For | Type | Date | |
| YouTube - CLEM7 TUNNEL, BRISBANE - (NSBT) | This thread | Refback | 27th September 2008 07:01 | |