![]() |
|
| | | ||||||
| | LinkBack (13) | Thread Tools | Display Modes |
| | #56 | |||||||||||
| New Urbanist ![]() Join Date: Oct 2006 Location: Brisbane, Queensland, Australia
Posts: 3,880
Thanks: 906
Thanked 494 Times in 258 Posts
Rep Power: 7 ![]()
| They are starting to run TV ads now to inform people about the project. There quite good! I'll try and capture one if I have the chance. | |||||||||||
| | |
| SkyScraperLife | ||
| |
| | #57 | |||||||||||
| New Urbanist ![]() Join Date: Oct 2006 Location: Brisbane, Queensland, Australia
Posts: 3,880
Thanks: 906
Thanked 494 Times in 258 Posts
Rep Power: 7 ![]()
| And here we go. Enjoy! ![]() Bris Connections AirportLink & Northern Busway Project Flythrough Last edited by SoulVision; 29th May 2008 at 06:22.. | |||||||||||
| | |
| | #58 | |||||||||||
| New Urbanist ![]() Join Date: Oct 2006 Location: Brisbane, Queensland, Australia
Posts: 3,880
Thanks: 906
Thanked 494 Times in 258 Posts
Rep Power: 7 ![]()
| I'm quite surprised at the sheer size of this project. The busway will be constructed in stages, but the expressway & Airport flyover will be done in one go, much like the NSBT. But I have to say that I was a little worried about Macquarie bank getting this job, but the designs look pretty awesome actually. | |||||||||||
| | |
| | #59 | |||||||||||
| Senior Member ![]() Join Date: Jun 2007
Posts: 159
Thanks: 0
Thanked 4 Times in 1 Post
Rep Power: 0 ![]()
| Thiess would have designed it, not Macquarie bank. | |||||||||||
| | |
| | #60 | |||||||||||
| Banned ![]() Join Date: Jan 2008 Location: Brisbane,QLD
Posts: 921
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 ![]()
| What ever you say. But soul I agree world class designs. | |||||||||||
| | |
| Bookmarks |
| Tags |
| airport, airportlink, bid, billion, bris, brisconnections, busway, bypass, city, connections, development, expressway, float, icb, infrastructure, link, macquarie, motorway, northern, nsbt, project, road, shareholder, stock, tunnel |
| Thread Tools | |
| Display Modes | |
| |