Go Back   SkyScraperLife > Global Skyscraper Discussion Forums > Skyscraper News & Proposed Projects
Connect with Facebook
Register FAQ Members List Calendar Mark Forums Read

Reply
 
LinkBack Thread Tools Display Modes
Old 9th February 2009, 19:55   #1
Junior Member
 
Join Date: Feb 2009
Posts: 1
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 0 RequiemOKC is an unknown quantity at this point
Points: 8, Level: 1 Points: 8, Level: 1 Points: 8, Level: 1
Level up: 1% Level up: 1% Level up: 1%
Activity: 0% Activity: 0% Activity: 0%
Default OKLAHOMA CITY | Devon Headquarters | 925ft | 54fl | App













Devon Energy, headquarted in Downtown Oklahoma City released their plans on August 21st 2008 to build their new downtown headquarters in Oklahoma City. Plans outline a 1.9 million sq. ft. building, with a southern courtyeard to tie in with the urban park directly south of the property.

This new skyscraper will be 421' taller than our current tallest, Chase Tower which stands at 504'.


More information continues to come out about the Devon Tower site. We now know the site will include an auditorium, retail space on the ground levels, a connecting structure to the neighboring boutique hotel the Colcord, and a fully public rotunda that will be the main entry to the entire facility.

Current Construction Timeline

Early 2009 - Parking facility construction begins
Spring/Summer 2009 - Site prep begins
November 2009 - Foundation complete
Late 2010 - Parking facility complete
Early 2013 - Full completion of site

-----

The site for the project is located on the surface parking lot adjacent and to the right of the large public greenspace at the center of this photo:



In an 93 page report that included all of the schematics, I only found one new rendering, which shows the curtain-wall parking garage and the tower in the background:



-------

Panel OKs Devon plan for building
BY STEVE LACKMEYER
Published: November 21, 2008


Inspired by the success of the New York Times’ new Manhattan headquarters, architects designing a world headquarters for Devon Energy are proposing to construct an auditorium at the corner of Hudson and Sheridan avenues.

The auditorium is one of several new details revealed Thursday as Devon Energy successfully presented its plans for approval by the Downtown Design Review Committee.

Weather considered
Architect John Pickard said designers have met challenges designing retail spaces along the ground floor of the "podium” building that will be just west of the 54-story tower and rotunda.

They want to open the spaces to the park, but also must contend with Oklahoma’s changing weather.

Their answer was to create rooms with French doors that could open up into the adjoining gardens and pavilions, designed to be open during fair weather and enclosed with glass during extreme conditions.

Pickard said the rotunda is designed to not just be a dramatic space — but a space that will be filled with people.

He said garage connections are designed to force all of Devon’s work force, as well as the public to enter through the rotunda.

Similar changes are being planned for the neighboring Colcord Hotel, which Devon bought in August.

‘Very urban thing’
Committee members praised the plans, but urged Devon Energy to consider adding a retail level on the first floor of a garage extension to face Hudson Avenue.

Member James Loftis noted the Devon project meets the city’s desires for urban architecture downtown compared with a "suburban” style building approved by the committee in September.

"This is a very urban thing — it goes far beyond anything I thought we’d see in our lifetimes,” Loftis said.

He also praised Devon Energy for placing the public rotunda instead of the tower in the center of the block.

"It’s phenomenal — I can’t wait,” member Richard Tanenbaum said.

"Why don’t you start construction now?”



------------


Devon plans auditorium at world headquarters
by Kelley Chambers
The Journal Record November 21, 2008

OKLAHOMA CITY – Devon Energy Corp. is tweaking and refining its plans for a world headquarters now set for completion in 2013.

Initial plans released by the company in March called for several structures on a piece of Urban Renewal land.

In August Larry Nichols, CEO of Devon, unveiled plans for a 54-story skyscraper, an additional 400,000-square-foot office building connected to the tower by a glass rotunda, and park space on the southwest side of the site.

One new addition presented to the Downtown Design Review Committee on Thursday included an auditorium nestled in the park space at the corner of Hudson and Sheridan avenues.

Jon Pickard, principal with the architecture firm Pickard Chilton, said the auditorium will be similar to the Times Center, a 378-seat auditorium built by the New York Times in Manhattan.

The Devon auditorium will likely seat about 250.

Pickard called the auditorium the “jewel of the park,” and said the company wants it to be available for community use.

“As we developed the design and we started to better analyze the needs of Devon for meeting facilities it seemed to be that an auditorium would help support the Devon corporate mission,” he said.

“It was always there as a thought, we just hadn’t developed it.”
Pickard said the auditorium is still a concept at this point and the exact size and cost have not been determined.

The second floor of the office building, dubbed The Podium, will also be a conference center.

Plans for parking were also discussed.

John Wood, vice president with Hines, and project officer for the Devon site, said plans are in the works for Devon to acquire the west side of the City Center Garage and add five floors exclusively for the company’s use.

Wood said the company would like to start work on expanding the garage upwards, and to the west toward Hudson Avenue, in the first quarter of 2009 and it should take 21 months to complete.

Plans for the tower call for demo work on the site beginning next year and the foundation for the tower could be in the ground by November.

The current timeline for the project calls for completion in early to mid-2013.

Last edited by RequiemOKC; 9th February 2009 at 19:59..
RequiemOKC is offline   Reply With Quote
SkyScraperLife
Old 9th February 2009, 20:37   #2
Super Moderator
 
paolapoa's Avatar
 
Join Date: Mar 2008
Location: Porto Alegre, Brasil
Posts: 10,355
Thanks: 429
Thanked 926 Times in 488 Posts
Rep Power: 12 paolapoa will become famous soon enough
Points: 67,597, Level: 100 Points: 67,597, Level: 100 Points: 67,597, Level: 100
Level up: 2% Level up: 2% Level up: 2%
Activity: 24% Activity: 24% Activity: 24%
Default

Great project to Oklahoma...
__________________
Ao matar seus demônios, cuidado para não destruir o que há de melhor em você.
paolapoa is offline   Reply With Quote
Old 6th April 2009, 03:33   #3
KBT
Senior Member
 
KBT's Avatar
 
Join Date: Apr 2008
Posts: 312
Thanks: 32
Thanked 27 Times in 25 Posts
Rep Power: 0 KBT is an unknown quantity at this point
Points: 1,085, Level: 17 Points: 1,085, Level: 17 Points: 1,085, Level: 17
Level up: 18% Level up: 18% Level up: 18%
Activity: 0% Activity: 0% Activity: 0%
Default

Such a big project for Oklahoma. Hope it goes ahead.
KBT is offline   Reply With Quote
Old 10th April 2009, 08:28   #4
Junior Member
 
Join Date: Apr 2009
Posts: 14
Thanks: 0
Thanked 3 Times in 2 Posts
Rep Power: 0 bob-bxu is an unknown quantity at this point
Points: 9, Level: 1 Points: 9, Level: 1 Points: 9, Level: 1
Level up: 1% Level up: 1% Level up: 1%
Activity: 0% Activity: 0% Activity: 0%
Default

the first picture reminds me of a building in Shanghai
bob-bxu is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT. The time now is 11:24.


Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.
Search Engine Optimization by vBSEO 3.2.0

SkyScraperLife.Com
2006 - 2009
eXTReMe Tracker -film indir - Web Stats

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255