| yes the last one on the schedule! i think it's a very wrong decision i guess it should be the most feasible one ![]() | |||||||||||
| | |
| | #7 | |||||||||||
| Moderator ![]() Join Date: Sep 2006 Location: İstanbul
Posts: 1,763
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 4 ![]()
| oh no the most feasible one should be İzmir-Bursa-İstanbul | |||||||||||
| | |
| | #8 | |||||||||||
| Administrator ![]() Join Date: Sep 2006 Location: Istanbul, Turkey
Posts: 3,225
Thanks: 19
Thanked 9 Times in 6 Posts
Rep Power: 25 ![]() ![]() ![]()
| Well, I think, they prefer to construct Ankara-Konya line for testing, because it's the most suitable line to test, between two major cities, no slope, no altitude etc.
__________________ If there is a wish, there is a way! | |||||||||||
| | |
| | #9 | |||||||||||
| Kuvvaci ![]() Join Date: Sep 2006 Location: Istanbul
Posts: 1,438
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 4 ![]()
| The construction of Ankara-Izmir line will start in 2007 or at the beginning of 2008. I guess, first Istanbul-Ankara will be finished and then Izmir-Ankara and Bursa will start. Next step will be Istanbul-Kapıkule and Ankara -Sivas. | |||||||||||
| | |
| | #10 | |||||||||||
| theheadofthe HaradrimArmy ![]() Join Date: Sep 2006 Location: west side, LB city, maybe İzmir
Posts: 206
Thanks: 1
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| this is slower one i think, any photos of Korean/Turkish machine? (over 300km/h)
__________________ ...aym in benz on mandey, biemır in tusdey, renc on venzdey, törsdey am in huuptey, porş on fraydey, ay du tingz may vey, vayp or vett, ay tir ap dı hayvey......so biç get in | |||||||||||
| | |