![]() |
|
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| | #16 | |||||||||||
| Premium Member ![]() Join Date: Oct 2006 Location: Istanbul Istanbul
Posts: 848
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| Finally the construction of the new generation highspeed trains begin and Turkey becomes the 8th nation that builds highspeed trains. Right now there are three lines unders construction. Ankara-Eskisehir, Eskisehir-Istanbul and Polatli-Konya. The first line will be opened on october 29th that means in less then one months. On this track the spanish made CAF's will be used which have a max. highspeed of 250km/h Spanish made CAF ![]() ![]() and next year we'll see the Turkish made highspeed trains which have a max. speed of 350 km/h which look like that: Turkish trains made by EUROTEM In the background: "Türkiye hizli tren üretiyor" = "Turkey produces its own highspeed train" ![]() HST made by the new founded company EUROTEM ![]() Last edited by messiah; 11th October 2006 at 02:05. | |||||||||||
| | |
| | #17 | |||||||||||
| Premium Member ![]() Join Date: Oct 2006 Location: Istanbul Istanbul
Posts: 848
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| Yammi Yammi sexy sexy!! ![]() ![]() ![]() ![]() ![]() | |||||||||||
| | |
| | #18 | |||||||||||
| Premium Member ![]() Join Date: Oct 2006 Location: Istanbul Istanbul
Posts: 848
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| Turkey started building high-speed rail lines in 2003. The first line, from İstanbul via Eskişehir to Ankara, is under construction.The first phase of the project (Ankara-Eskisehir) will be opened on october 29th and the rest at the end of 2007. The traveling time will be reduced from 6–7 hours to 3 hours 10 minutes. The second line (Ankara-Konya) began construction in 2006. A travel time of 70 minutes is foreseen for this track. Several other lines between major cities are planned: Ankara - Afyon - Uşak - İzmir Ankara - Yozgat - Sivas İstanbul - Bursa Ankara - Bursa İstanbul - Kapıkule (Bulgarian border) A general overview: ![]() ![]() Last edited by messiah; 11th October 2006 at 02:26. | |||||||||||
| | |
| | #19 | |||||||||||
| Premium Member ![]() Join Date: Oct 2006 Location: Istanbul Istanbul
Posts: 848
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| Some old construction works: ![]() ![]() ![]() ![]() ![]() ![]() | |||||||||||
| | |
| | #20 | |||||||||||
| Premium Member ![]() Join Date: Oct 2006 Location: Istanbul Istanbul
Posts: 848
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| First the spanish made CAF (max. speed 250 km/h) will be used on this line: ![]() ![]() Spanish made CAF with a max. speed of 250 km/h: ![]() In 2008 Turkish-Korean made HSR 350X with a max. speed of 350 km/h will be used: [IMG] [/IMG] | |||||||||||
| | |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
| |