| We've already opened a topic about Turkish railways but I think highspeed should be separated from the rest since it's much cooler Let's post here the latest developments and pictures.These are the major lines which will be comleted by 2012. Two of them are already under construction: ![]() 1: Ankara-Eskisehir-Istanbul: Under construction ![]() Latest construction pictures of the Ankara-Eskisehir-Istanbul line: ![]() ![]() ![]() ![]() ![]() ![]() ![]() 2: Ankara-Polatli-Konya: Under construction ![]() Latest construction photos of the Ankara-Polatli-Konya line: ![]() ![]() ![]() ![]() ![]() ![]()
__________________ Aga'nin pohunun üstüne poh haaaa!!!! | |||||||||||
| | |
| | #2 | |||||||||||
| Premium Member ![]() Join Date: Oct 2006 Location: Istanbul Istanbul
Posts: 844
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2 ![]()
| Now some information about the trains that will be used: Turkish Railway ordered 10 of these Spanish made CAF highspeed train sets. They have a max. speed of 250 km/h. The trains will be delivered in some weeks according to TCDD. ![]() ![]() The production of the new generation highpeed train started and first sets will be delivered in 2007. They are produced in Turkey and will have a max. speed of 350 km/h. So I guess that both trains will be used at all lines. ![]() ![]() ![]() ![]() ![]()
__________________ Aga'nin pohunun üstüne poh haaaa!!!! | |||||||||||
| | |
| | #3 | |||||||||||
| Samuel Vanunu ![]() Join Date: Oct 2006
Posts: 314
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2 ![]()
| THey are planning a HS railline to Kayseri too..
__________________ http://mehmetkale.blogspot.com Tahvil, bono ve hisse senedi spekulatoruyum, baronun sag koluyum. | |||||||||||
| | |
| | #4 | |||||||||||
| Premium Member ![]() Join Date: Oct 2006 Location: Istanbul Istanbul
Posts: 844
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2 ![]()
| Yes but I wanted to post lines which are under construction. I think by 2015 all major cities(also eastern ones) will be connected to the system.
__________________ Aga'nin pohunun üstüne poh haaaa!!!! | |||||||||||
| | |
| | #5 | |||||||||||
| Samuel Vanunu ![]() Join Date: Oct 2006
Posts: 314
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2 ![]()
| I was commenting on this map: ![]() The first group of lines are now: Istanbul-Ankara, Ankara-Konya, Ankara-Sivas, Osmaneli-Bursa, Izmir-Ankara, and Yerkoy-Kayseri... Second group will start with Kars-Erzincan-Erzurum-Sivas