![]() |
|
| | |||||||
| | LinkBack | Thread Tools | Display Modes |
| | #1 | |||||||||||
| Kuvvaci ![]() Join Date: Sep 2006 Location: Istanbul
Posts: 1,438
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| Two well planned lines and one suburban rail line are currently operating in Ankara, but construction of new lines are going on the map shows both current lines and under construction lines wich will be complated in the near future. ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() | |||||||||||
| | |
| | #2 | |||||||||||
| Moderator ![]() Join Date: Sep 2006 Location: İstanbul
Posts: 1,762
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| how long line is already built? how long is U/C? how long planned due when? | |||||||||||
| | |
| | #3 | |||||||||||
| Kuvvaci ![]() Join Date: Sep 2006 Location: Istanbul
Posts: 1,438
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| ![]() ![]() ![]() ![]() ![]() ![]() ------------------------------------------------------------- one of the new under construction stations ![]() | |||||||||||
| | |
| | #4 | |||||||||||
| Researcher ![]() Join Date: Oct 2006
Posts: 955
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 2 ![]()
| I heard that they already completed the stations on Eskisehir highway.. | |||||||||||
| | |
| | #5 | ||||||||||||
| Kuvvaci ![]() Join Date: Sep 2006 Location: Istanbul
Posts: 1,438
Thanks: 0
Thanked 0 Times in 0 Posts
Rep Power: 3 ![]()
| Quote:
![]() | ||||||||||||
| | |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
| |